| Location: | Florida |
|---|---|
| Posted: | Oct 16, 2025 |
| Due: | Nov 13, 2025 |
| Agency: | Manatee County School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0086-KD |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
|
Dears, here are 6 questions:
1. Please inform quantities for the following item, “Switches must connect to each sites core switch with 10-Gigabit LC LRM fiber Gbics”. 2. Please inform quantities and topology for the following item, “Each IDF closet must support a single 10-Gigabit LC LRM fiber Gbic for connection back to the site’s MDF switch”. 3. Please inform quantities and topology for the following item, “Each MDF closet switch design must be able to support up to a minimum of 240– RJ-45 autosensing 10/100/1000 PoE+ ports with 2 open 10GbE SFP+ transceiver slots (4 or 8 open module slots for support of 10GbE SFP+ transceivers or RJ-45 autosensing 10/100/1000 PoE+ ports or any combination thereof). Each closet configuration will vary”. 4. Please inform quantities for the following item, “Aruba 10G SFP+ LC LRM Multi Mode Transceiver (J9152D or equivalent)”. 5. Please inform quantities for the following item, “Aruba X132 10G SFP+ LC LR (10k) Single Mode (J9151D or equivalent)”. 6. Please inform quantities for the following item, “Aruba X132 10G SFP+ LC ER (40k) Single Mode (J9153D or equivalent)”. |
10/14/2025 9:46:49 AM | ||
| Should services for uninstalling existing equipment, installing new equipment, configuration, and other services be quoted? If so, please provide details. | 10/14/2025 1:01:47 PM | ||
| Is it permitted to submit a proposal in a consortium (two companies)? If so, what is required? | 10/16/2025 9:24:19 AM |
| Code | Description |
| [206-23] | Communication Processors and Protocol Converters: Front-End Processor, Network Interface Module, Protocol Interchange, Switching Controls, etc. |
| [206-55] | Integrated Hardware-Software I.T. Solution (Mini/Mainframe Computer) |
| [206-59] | Modems, External Data Communications |
| [206-64] | Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc. |
| [204-13] | Cables: Printer, Disk, Network, etc. |
| [204-28] | Data Entry and Remote Job Entry Devices, Voice Activated: Voice Recognition, Voice Digitization, Speech Synthesizers, etc. |
| [204-58] | Modems, External, Data Communications |
| [204-64] | Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc. |
| [055-68] | Monitors, Computerized and Wireless (Including Equipment Utilization, Engine/Driver Performance, Brakes, Lights, RPM, Temperature, etc.) |
| Publication | Date |

With GovernmentContracts, you can:
...Project ID: Title: Group Dental and Vision Insurance Plans Addenda: 0 Release Date: ...
Brevard Public Schools
Bid Due: 7/01/2026
...Insurance Required No Bid Bond Required No Bid Bond Amount Performance Bond Required ...
Pinellas County School Board
Bid Due: 6/11/2026
...Insurance Required Yes Bid Bond Required Yes Bid Bond Amount 5% Performance Bond ...
City of DeLand
Bid Due: 6/18/2026
...Insurance Required Yes Bid Bond Required No Bid Bond Amount Performance Bond Required ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/08/2026