BASE:
Work consists of maintenance dredging the locations to required depths indicated in the table below and on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as indicated on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.
LOCATION
REQUIRED DEPTH
Range H to I and Upper Turning Basin (UTB)
45-foot UTB,
45-foot and 47-foot Channel
Range G to H and Explosive
Handling Basin (EHB)
44-foot and 47-foot
Range E to G and Magnetic Silencing Facility (MSF) North
44-foot
Site Six North (SS-N)
39-foot
Site Six South (SS-S) and Medium Auxiliary Repair Dock (ARDM) Yoke
45-foot
Explosive Handling Wharves (EHW)
47-foot
Refit Wharves
47-foot
Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility
46-foot
Option A:
Work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.
Option B:
Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as indicated on the drawings and as directed by the Contracting Officer. Option B work also includes bird monitoring and standby time.
LOCATION
REQUIRED DEPTH
Site Six South (SS-S) and Medium Auxiliary Repair Dock (ARDM) Yoke
45-foot
Site Six North (SS-N)
39-foot
Explosive Handling Wharves (EHW)
47-foot
Refit Wharves
47-foot
Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility
46-foot
Option C:
Work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.

With GovernmentContracts, you can:
...ft. wide to the upper end of Kings Island Turning Basin: 36 ft. ...
DEPT OF DEFENSE
Bid Due: 7/01/2026
...Turning Basin: 36 ft. deep MLLW / 400 ft. wide to the upper ...
DEPT OF DEFENSE
Bid Due: 7/01/2026