| Location: | Texas |
|---|---|
| Posted: | Jun 13, 2025 |
| Due: | Jun 13, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The following five (5) offerors will be invited to participate in Phase 2 of this acquisition for Solicitation Number: W9126G24R0126, Child Development Center, Randolph Air Force Base, San Antionio, Texas.
StructSure Projects
ATTN: Mr. Kevin Rogers, CEO
903 E 104th St., Suite 140
Kansas City, MO 64131
Clark Construction Group, LLC
Attn: Ms. Cara K. Lanigan, CEO
7500 Old Georgetown Road
Bethesda, MD 20814
AR6-White Construction, LLC
Attn: Mr. John C. Anness II, President
26726 Rockwell Parkway
New Braunfels, TX 78132
SGS, LLC
ATTN: Mr. Eddie Scott, President
2121 Sough Mustang Road
Yukon, OK 73099
Bryan Construction Inc.
ATTN: Mr. Rusty Chamberlain, Executive
5475 Tech Center Drive, Suite 300
Colorado Springs, CO 80919, USA
This project is a Design Build construction of a large Child Development Center (CDC) utilizing the standard facility design using a Two-Phase Design Build process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures at JBSA Randolph which will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen and equipment, playground areas and equipment, security system, CCTV, utilities, concrete foundation, concrete floor slabs, structural steel frame, masonry walls, standing seam metal roof, and all associated support.

With GovernmentContracts, you can:
...: Open Description: Structural design of the sign support, its foundation, and the ...
City of Sherman
Bid Due: 8/11/2026
...steel sheet; FLOOR SUPPORTS: 3-inch structural channels, 16 in on-center; EXTERIOR POSTS:12 GA... ...
DEPT OF DEFENSE
Bid Due: 7/27/2026
...application; FLOOR CONSTRUCTION: 10 GA steel sheet; FLOOR SUPPORTS: 3-inch structural channels, 16... ...
DEPT OF DEFENSE
Bid Due: 7/27/2026
...-story facility with a drilled pier foundation, concrete floor slabs, structural steel framing...
Federal Agency
Bid Due: 8/04/2026