| Location: | Idaho |
|---|---|
| Posted: | Jun 13, 2025 |
| Due: | Jul 9, 2025 |
| Agency: | City of Boise |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FB-2025-067 |
| Publication URL: | To access bid details, please log in. |
Replacement of stainless steel & fiberglass ducting/pipe with new stainless steel and HDPE. Replacement of the foul air blowers.
Open: 6/13/2025 10:00 AM MDT
Close: 7/9/2025 10:00 AM MDT
Type: FB-
Number: FB-2025-067
Contact:
Contact:
Details:

With GovernmentContracts, you can:
...Control drum actuators The Heat Management System (HMS) heat pipes Power Conversion System ...
ENERGY, DEPARTMENT OF
Bid Due: 9/24/2026
...Geothermal HDPE Materials (GEO1006) Geothermal HDPE Pipe and fittings to replace main lines ...
City of Boise
Bid Due: 9/30/2026
...-inch diameter, 777 L.F. of 10-inch diameter, and 2,450 L.F. of 8-inch diameter ...
City of Boise
Bid Due: 9/25/2026