| Location: | Rhode Island |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N4008526R0219 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
NAVFAC Solicitation No. : N4008526R0219, Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI
THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
N40085-21-D-0052 Benaka Inc.
N40085-21-D-0053 CCI Utility and Construction Services, LLC
N40085-21-D-0054 Kunj Construction Corporation
N40085-21-D-0055 Ocean Construction Services
N40085-21-D-0056 PEM-Harkins Joint Venture
N40085-21-D-0057 Tantara Corporation
N40085-21-D-0066 J&J Contractors, Inc.
DESCRIPTION OF WORK:
The work includes removal of (4) facilities from the building A6 steam supply system. The (4) buildings being taken off of steam service (23A, 43, 44, and 49) shall have their steam to heating hotwater exchangers removed and natural gas boilers provided in their place. Building B23A shall also have its domestic hot water heaters replaced.
Work includes the trenching and backfilling for the installation of gas piping to each of four buildings, restoration of paving due to gas piping installation, The contractor shall be responsible for connecting to the utility meter and provide gas distribution to the installed boilers.
This amendment 0001 incorporates the following :
(1) A6 Decentralization_DRAWINGS_Rev-20260805.pdf
(2) A6 Decentralization Submittal Register.pdf
(3) Basis of Design for reference only.pdf
(4) Final Soil Management Plan Effective February 4, 2026 Signed.pdf
(5) ICRA Requirements.pdf
(6) NHCNE Decentralize Steam - PPI_Final_Responses
(7) Site Visit Sign in sheet
(8) Proposal Due date extended to 26 AUGUST 2026 02:00 PM

With GovernmentContracts, you can:
...Follow Construction- NUWCDIVNPT- Vaporizer Enclosure (Design/Build) Active Contract Opportunity... Undersea Warfare Center Division, ...
DEPT OF DEFENSE
Bid Due: 9/25/2026
...Follow N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION ...
DEPT OF DEFENSE
Bid Due: 10/16/2026
.../Location: DESIGN-BID-BUILD P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT... to ...
DEPT OF DEFENSE
Bid Due: 10/13/2026
...: Newport , RI 02841 USA Description Project Title/Location: DESIGN-BID-BUILD P084 NEXT GENERATION...@us.navy.mil. ...
DEPT OF DEFENSE
Bid Due: 10/13/2026