INVITATION TO BID
GOLF COURSE RENOVATIONS
ALGONKIAN REGIONAL PARK
Sealed bids will be received by mail or in person at the NOVA Parks Headquarters, 5400 Ox
Road, Fairfax Station, Virginia 22039, until the submission deadline of November 12th, 2026, at
10:00 a.m. EST. Bids will be opened in public at the NOVA Parks Headquarters on November
12th, 2026, at 1:00 p.m. EST.
Bids and bid bonds (if applicable) may be (1) submitted in person at the NOVA Parks
Headquarters, (2) sent via U.S. Mail or other delivery service, or (3) electronically transmitted
by emailing to NOVAParksBids@nvrpa.org.
Any bid received after the submission deadline as noted above will not be accepted or
considered. The time of receipt shall be determined as the time the bid is received by NOVA
Parks. Bidders are solely responsible for ensuring that their bid and supporting documents
are received by NOVA Parks by the submission deadline. Bidders may request written
confirmation of receipt of their bid.
NOVA Parks is not responsible for delays in the delivery of email, or emails misdirected to
incorrect email addresses.
For bids submitted in person or via U.S. Mail or other delivery service, bidders should:
* Label bids to the attention of the Director of Planning and Development.
* Include on the outside of the bid the name of the bidder and the project name as noted
on the cover sheet of the Project Manual.
For bids submitted via email, bidders should:
* Include in the bid email subject line the name of the bidder and the project name as
noted on the cover sheet of the Project Manual.
* Send the bid email with an automated request for a receipt to be sent back to the
bidder when the email is read/opened. Bid emails will not be opened by NOVA Parks
until the submission deadline.
* Submit the bid Form of Proposal, and any other supporting documents, as PDF
attachments to the email. Do not include these documents in the body of the email.
* Notify the NOVA Parks Project Manager of their intent to submit an electronic bid at
least 24 hours prior to the bid deadline.
This project includes the renovations of holes #4, and #6 as described in the supplemental
general conditions and the golf course improvements spreadsheet provided.
A Five percent bid bond or certified check must be submitted with the sealed bid for all total
bids over $500,000. The total bid shall be determined by the sum of the base bid and all
alternates. All bids and bid bonds shall remain valid for ninety days. Performance and Labor and
Material Payment bonds shall be required of the successful bidder for all contracts awarded
over $500,000.
Contract documents may be obtained by visiting the NOVA Parks Website www.novaparks.com
at https://www.novaparks.com/about/bids-proposals. The Contractor shall be responsible to
verify and obtain any addendum prior to the bid date. Project addenda will be posted on the
website. Contract documents include the following:
* Project Manual dated Thursday, October 8, 2026
* Golf Course Improvements 2026 - Algonkian Golf Course
To schedule a site visit please contact Pohick Golf Course Superintendent, Bryan McFerren, at
703-430-6033. If you have any questions concerning this project, contact Rodney Thomas,
Project Manager, at (703-359-4617). All questions regarding the project or bid process shall be
in writing and sent via email to rthomas@nvrpa.org.
All interested Bidders shall formally register with NOVA Parks by contacting Leslie Preble via
email at lpreble@nvrpa.org or by calling 703-359-4626. Bidders shall provide Mrs. Preble with
the following information:
Company Name
Contact person Name and Title
Phone Number and Email Address
FORM OF PROPOSAL - PAGE 1 OF 2
GOLF COURSE RENOVATIONS
ALGONKIAN REGIONAL PARK
PROPOSAL
To furnish all material, labor, tools, equipment and supplies to perform all work specified herein
and shown in the contract documents.
Name of Bidder: ___________________________________________________
Address of Bidder: __________________________________________________
Signature: _________________________________________________________
Print Name and Title: ________________________________________________
Date: ______________________________________________________________
Contact Phone Number: _______________________________________________
Bidder's Virginia Contractor's License ____________________________________
To: Brian Nolan, Director of Planning and Development
Northern Virginia Regional Park Authority
5400 Ox Road Fairfax Station, Virginia 22039
Bidders shall fill in all blank spaces on the Form of Proposal.
Pursuant to and in compliance with the contract documents, the undersigned proposes and
agrees, if this proposal is accepted, to furnish all labor, materials, supplies, equipment, and
other facilities, and to perform all work described in the project manual in the manner therein
prescribed for consideration of the following amount.
FORM OF PROPOSAL - PAGE 2 OF 2
GOLF COURSE RENOVATIONS
ALGONKIAN REGIONAL PARK
BASE BID: All work as described in the project manual and plans.
_______________________________________________Dollars / $_____________
Acknowledge Receipt of Addendum # dated___________.
Acknowledge Receipt of Addendum # dated __________.
Acknowledge Receipt of Addendum # ______dated__________.
****END OF FORM OF PROPOSAL****
| The project includes #4 Tee Construction (2) Ex. Gold Tee, Lower 8", 50'x30', New Red Tee: |
|---|
| 330y, Raise 15", 30'x30' and #6 Tee Construction New Forward Tee: 390y, Raise 12", 30'x30' |
SUPPLEMENTAL GENERAL CONDITIONS
PART I. - GENERAL
All bidders shall submit their bids on the Form of Proposal.
Prior to the award, each Bidder/Offeror must certify the number of active contracts currently active with
NOVA Parks. For purposes of this Solicitation, an "Active Contract" shall mean any contract awarded by
NOVA Parks under which the Bidder/Offeror has not fully completed all required work or satisfied all
contractual obligations.
NOVA Parks reserves the right to disqualify any Bidder/Offeror that, at the time of evaluation, holds
more than three (3) Active Contracts with a value exceeding $200,000 each. The final determination of
a Bidder/Offeror's eligibility for award shall be made solely by NOVA Parks and may include, but is not
limited to, consideration of the volume, scope, capacity, and schedule of the Bidder/Offeror's Active
Contracts.
The Contractor shall repair all miscellaneous damages caused by his forces during the course of
this project.
The Contractor shall provide the Owner at least 48 hours notice prior to beginning of any work.
The Contractor shall be responsible for meeting all VDOT and any other government
requirements regarding construction traffic utilizing their roadways and entrances to the site
and shall be responsible for obtaining VDOT permit.
Materials may be stored on site only with prior approval from the Park Authority. Only material
that is to be used on this project may be stored on site.
The project includes #4 Tee Construction (2) Ex. Gold Tee, Lower 8", 50'x30', New Red Tee:
330y, Raise 15", 30'x30' and #6 Tee Construction New Forward Tee: 390y, Raise 12", 30'x30'
All bidders shall submit their bids on the attached Form of Proposal. There is a downloadable
spreadsheet that the contractor may use at his convenience.
NOVA Parks reserves the right to disqualify any bidders who are determined not to have
adequate experience or favorable client references. Any disqualifications shall be at the sole
discretion of NOVA Parks.
The project shall be completed within 60 days of the written Notice to Proceed. If the work is
not completed within the time required, as that time may be adjusted by change orders, there
shall be imposed on the Contractor liquidated damages of $300.00 per calendar day for each
day beyond the contract time it takes to complete the work.
Submittals shall be made to the Owner for approval of all materials.
Three copies of submittals shall be provided to NOVA Parks at least seven days prior to the
delivery and use of the material or product at the site. NOVA Parks shall review submittals
within four days. If the submittal is rejected, the Contractor shall resubmit as required and
delay delivery and use of the material or product until the submittal is approved. This delay
shall not be cause for an extension of the contract completion date.
Contractor shall provide at least 48 hours' notice prior to beginning of work.
The golf course shall remain open during this project. The Contractor shall show consideration
to patrons. The Owner will not be responsible for damaged caused to Contractor equipment or
material due to play.
All work will be completed during weekday business hours as designated by the Golf Course
Superintendent, generally from dawn to dusk. No work shall be permitted on weekends or
holidays without prior approval from NOVA Parks.
No excavations shall be left open through a weekend or holiday. Open excavations left
overnight must be marked to prevent injury to the public and NOVA Parks' staff.
The Contractor shall repair all miscellaneous damages caused to park property by his forces
during this project.
The Contractor shall limit the disturbance to the designated work areas. All disturbed areas will
be graded, raked with all rocks and debris greater than 3/4" disposed of off site.
PART II. - WARRANTY AND AS-BUILTS
The Contractor shall provide a written warranty to the Park Authority covering all defects in
materials and workmanship for a period of one year from the date of project completion. All
warranties provided by the equipment and materials manufacturers shall also be provided to
the Park Authority.
The Contractor shall maintain during the progress of the work, a complete and up-to-date set of s-built
drawings and specifications, which shall be available for inspection by the Owner and Engineer at any
time. These documents shall be marked up to record all changes in the work as they occur. As-built
documents shall be neatly marked with red colored pencil or ink, and three copies shall be delivered to
the Owner in a condition satisfactory to him as a condition precedent to final acceptance of the work.
The Contractor shall provide the Owner's manual detailing equipment specifications and proper
use and maintenance of all materials (See Specifications for details). The Contractor shall
provide three copies of the Operating and Maintenance manual. Each copy should be bound in
a sturdy three ring binder, indexed, and labeled as follows:
OPERATING & MAINTENANCE MANUAL
Golf Course Renovations
-DATE-
The typewritten manuals shall include the following:
1. Name, address, telephone number and contact person (if applicable) of all Contractor(s)
involved in the project.
2. The Contractors' written one-year warranties as noted above.
3. Complete manufacturers' operating and maintenance instructions for all materials and
equipments.
4. Manufacturers' warrantees for all materials and equipment.
5. List of color selections used for all finishes, to include the brand name, manufacturer,
and color numbers.
PART III - PROTECTION OF ARCHAEOLOGICAL RESOURCES AND ARTIFACTS
1. PROTECTION OF ARCHAEOLOGICAL RESOURCES
A. The Owner and the local jurisdiction have determined that there might be
archaeological resources on this site. The Contractor shall recognize preservation
responsibilities as defined in the "Archaeological and Historic Preservation Act of 1974"
and revised in 1992 and shall be governed by them and the provisions contained herein.
B. The Contractor shall notify the Owner at least 48 hours prior to any ground disturbing
activities.
C. In the event that archaeological resources are identified during construction, all work
shall be temporarily suspended in those areas. Work shall not resume in those areas
until notified by the Owner.
D. The Contractor shall provide access to the site for any archaeological staff, as directed
by the Owner.
E. The Contractor shall keep accurate records of any delays associated with suspended
work related to archaeological resources and shall submit any claims for extension of
time to the Owner in accordance with the general conditions. Monetary claims for such
delays shall be approved at the sole discretion of the Owner.
2. ARTIFACTS
A. All artifacts found on the site shall remain the property of the Owner.
8
B. All artifacts discovered on the site shall be left in place and intact, until removed by the
Owner, or by the Fairfax County archaeological staff, or as otherwise directed by the
Owner or his representative.
*****END OF SUPPLEMENTAL GENERAL CONDITIONS*****
9
NVRPA DOCUMENT GC 101
INSTRUCTIONS TO BIDDERS AND
GENERAL CONDITIONS OF THE CONTRACT
FOR CONSTRUCTION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;
CONSULTATION WITH AN ATTORNEY IS ENCOURAGED
2018 EDITION
- 1 -

With GovernmentContracts, you can:
2026-03145 - Cabell Library 4th Floor Special Coll... Status: Open IFB 129982 Virginia
State Government of Virginia
Bid Due: 11/17/2026
Rosedale Epoxy Flooring Install Status: Open RFP 129913-2 Alleghany County -110 Rosedale AveCovington,
State Government of Virginia
Bid Due: 12/01/2026
Follow LOADING DOCK CONCRETE REPAIRS Active Contract Opportunity Notice ID 36C24626Q1099_1 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 11/24/2026
Greensville Recoating and Repairs to Water Tank 79... Status: Open IFB 129431-3 DOC
State Government of Virginia
Bid Due: 11/18/2026