| Location: | Washington |
|---|---|
| Posted: | Dec 3, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | F-010 |
| Publication URL: | To access bid details, please log in. |
Project Description: This Contract provides for the installation of two (150 kW and 80 kW) diesel generators located on City properties. Work includes, but is not limited to, excavation, subgrade preparation, furnishing and installing concrete generator pad, miscellaneous surface restoration, conduits supporting future EV charging stations, and other work, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
The estimated construction cost is $634,000

With GovernmentContracts, you can:
...site and building improvements associated with an interim fire station and restoration of ...
City of Seattle
Bid Due: 9/30/2026
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026
...stabilization. I. Construction of outlet works piping including grout encasement and concrete encasement... ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026