Project Description: This Contract provides for the installation of two (150 kW and 80 kW) diesel generators located on City properties. Work includes, but is not limited to, excavation, subgrade preparation, furnishing and installing concrete generator pad, miscellaneous surface restoration, conduits supporting future EV charging stations, and other work, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
The estimated construction cost is $634,000

With GovernmentContracts, you can:
...is to secure services to perform a range of construction activities at the ...
Pierce County
Bid Due: 6/12/2026
.../switchgear, conduit, wiring), trenching, grading, filling, paving, sealing, mounting..., capacity analysis, permitting (electrical ...
Sammamish Plateau Water
Bid Due: 7/02/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek... transportation systems ...
State Government of Washington
Bid Due: 6/24/2026