| Location: | Nebraska |
|---|---|
| Posted: | Sep 14, 2026 |
| Due: | Sep 24, 2026 |
| Agency: | Lincoln Housing Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
SECTION 01 00 00 - GENERAL
1. Proposal: Provide proposal on Contractor's standard form. Provide pricing to
remove and replace existing pavement shown on the attached Site List and Drawings.
Proposal shall reference this Request for Proposal document. Proposal should be
submitted by Thursday, September 24th, 2026, at 5:00 PM.
2. Review of Sites and Documents: Determine that the Work can be executed as
shown on the Drawings and in the Specifications. Notify the Architect immediately of
any discrepancies. If any errors or omissions are found in the Drawings or any other
documents during bidding or construction, the Contractor shall notify the Architect and
request clarification before proceeding with the Work. The Contractor shall field verify
the square-footages described in the site list prior to submitting a proposal.
3. Bonds: No bonds are required for this proposal, either Bid Bond or Performance
and Labor and Material Bond.
4. Insurance: Before LHA will issue a Purchase Order, the Contractor shall
furnish LHA with a certificate of insurance showing the minimum insurance coverage as
attached below is in force.
5. Payments to Contractor: An Invoice for payment shall be submitted to the Owner
at the completion of all work.
6. Contractors Responsibility for Work: The Contractor shall supervise and direct
the Work, using the Contractor's best skill and attention. The Contractor shall be solely
responsible for and have control over construction means, methods, techniques,
sequences and procedures, and for coordinating all portions of the Work under the
Contract, unless Contract Documents give other specific instructions concerning these
matters.
The Contractor shall enforce strict discipline and good order among the Contractor's
employees and other persons carrying out the Contract. The Contractor shall not permit
employment of unfit persons or persons not skilled in tasks assigned to them.
Protect the Work, adjoining property, and the public. The Contractor shall be
responsible for any and all damage or injury due to his acts or neglect. Furnish all such
repair work to rectify any damage at no extra cost to the Owner.
7. Tenant Notice: The Contractor shall notify affected tenants and the LHA Project
Coordinator (Corby Renard at 402-326-2916) at least 48 hours prior to the
commencement of the work at each site. LHA has preprinted notices available for the
Contractor to use in notifying the tenants.
Job Number CI-2027-23
8. Construction Schedule: Coordinate with Owner's representative to schedule
work. Complete in least practical amount of time. All work is to be completed prior to
November 1, 2026. LHA would like the work done as soon as possible.
9. Temporary Facilities & Controls: Provide all temporary utilities, (water &
electricity) as may be required. Provide barricades and signs as required to direct traffic
around work. Provide temporary sanitary facilities for the use of all workmen.
10. Cleaning: Keep the sites clean. Clean up and remove work related trash
immediately upon completion of each day's work. No debris shall be allowed to blow
about on the site or on adjacent property.
END OF SECTION
Wood Bridge Concrete 2026, PAGE 2
Job Number CI-2027-23
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART ONE - GENERAL
1.1 DESCRIPTION
1.1.1 Work included: Selective removal and subsequent off-site disposal of
existing construction including, but not necessarily limited to:
1) Removal of existing concrete curbs, drives, and other items to be replaced;
2) All other items which must be removed to complete work as described in the
Drawings and these Specifications.
1.2 JOB CONDITIONS
1.2.1 Occupancy: Owner's Tenants will occupy buildings immediately adjacent to
areas of selective demolition. Conduct selective demolition work in a manner that will
minimize the need for disruption of Owner's Tenant's normal operations. Coordinate
with Owner to schedule demolition activities.
1.2.2 Condition of Structures: Owner assumes no responsibility for actual condition
of items to be demolished. Conditions existing at time of commencement of contract will
be maintained by Owner insofar as practicable; however, variations may occur.
1.2.3 Salvageable Items: All removed material shall be removed from the site for
disposal or Contractor's salvage. Contractor's storage or sale of removed items on site
will not be permitted.
1.2.4 Utility Services: Maintain existing utilities to remain. Keep in service and
protect against damage during demolition.
1.3 PRODUCT HANDLING
1.3.1 Protection: Provide temporary barricades and other forms of protection as
required to protect Owner's Tenants and general public from injury due to selective
demolition work. Use all means necessary to protect all items and construction to
remain, including but not limited to flagging and barricades. Do not allow water to stand
on subgrades where concrete has been removed.
1.3.2 Replacements: In the event of damage, immediately make all repairs and
replacements necessary to the approval of the Architect and at no additional cost to the
Owner.
PART TWO - PRODUCTS
Wood Bridge Concrete 2026, PAGE 3

With GovernmentContracts, you can:
Kearney Housing Project RFP 08-17-2026
City of Kearney
Bid Due: 11/18/2026
Follow Gavins Point Crane Rail Replacement Active Contract Opportunity Notice ID W9128F26RA023 Related
DEPT OF DEFENSE
Bid Due: 10/02/2026
Follow Gavins Point Crane Rail Replacement Active Contract Opportunity Notice ID W9128F26RA023 Related
DEPT OF DEFENSE
Bid Due: 10/02/2026
Post Date 09/22/2026 Quest Number 10383859 Category Code Paving - Concrete,Sewer and Water
City of Sioux City
Bid Due: 10/13/2026