| Location: | North Carolina |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 269-2027-041 |
| Publication URL: | To access bid details, please log in. |
Project Description: Installation of Six New Dual Port, 80 amp, Level II EV Chargers and all required power distribution equipment as required to serve the chargers. The scope of work will include design for future chargers for a total of twelve (12) Level II Chargers. Provisions for future chargers will include space for future panel with conduit run to future chargers locations and capped off watertight. This scope also includes adding one 200 KW DC fast charger and required electrical service and equipment to feed this charger. All other equipment is existing to remain. Chargers are owner provided and contractor installed.

With GovernmentContracts, you can:
WBS Element: 2027CPT.10.07.10132, 2027CPT.10.07.20132 POC Microsurfacing 3 Sections of NC 24/27 and 8
Division of Highways
Bid Due: 11/18/2026