| Location: | Nevada |
|---|---|
| Posted: | Aug 19, 2026 |
| Due: | Aug 21, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26126R0050_0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOLICITATION NO: 36C26126R0050
Amendment 0001
PROJECT TITLE: Project 654-26-020, Building 12 Pump Power Relocation
LOCATION: VA Sierra Nevada Health Care System (Reno VAMC), Reno, NV NAICS CODE: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
PRODUCT SERVICE CODE (PSC): 6150 (Miscellaneous Electric Power and Distribution Equipment)
SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB)
AMENDMENT 0001 – SOLICITATION UPDATE & PROPOSAL DUE DATE EXTENSION
The Department of Veterans Affairs, Network Contracting Office (NCO) 21, is issuing Amendment 0001 to formally amend Request for Proposal (RFP) 36C26126R0050. Due to a system transmission error that delayed the release of previous draft updates, this consolidated amendment formally implements the following updates to the solicitation package:
1. PROPOSAL DUE DATE EXTENSION: The deadline for receipt of proposal packages is formally extended to Friday, August 21, 2026, at 12:30 PM PDT. All technical and price volumes must be submitted electronically via email to the Contract Specialist, Edwin Rivera (edwin.rivera@va.gov).
2. REVISED STATEMENT OF WORK (SOW): Formally deletes the previous SOW V2 and replaces it in its entirety with "SOW Bldg 12 Power Relocation V3, dated August 13, 2026" to clarify physical basement parameters.
3. INCORPORATION OF TECHNICAL BASES: Formally attaches and incorporates the following technical baseline files discussed during the on-site walkthrough:
- Attachment 1: Drawing titled "Bldg 12 Basement Pump Power Brief Routing Diagram, dated August 19, 2026"
- Attachment 2: Existing Electrical Panel Schedules labeled "MCC Schedules 5-6-22" and "GNHA 9-18-19" (to serve as the baseline for the required post-award panel updates, red lines, and one-line diagram modifications under SOW Section 4).
ACKNOWLEDGMENT OF AMENDMENT REQUIRED: Offerors must formally acknowledge receipt of Amendment 0001 prior to the Friday, August 21, 2026, 12:30 PM PDT deadline by completing Item15 of Standard Form 30 (SF-30) and submitting a signed copy with their final proposal package. Failure to acknowledge this consolidated amendment may result in your proposal being determined non-responsive. Except as provided herein, all other terms and conditions of the solicitation remain unchanged and in full force and effect.
| Aug 28, 2026 | [Solicitation (Updated)] 6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV |

With GovernmentContracts, you can:
...under this Contract is for the construction of fully operational Traffic Signal System... ...
Nevada Government eMarketplace (NGEM)
Bid Due: 9/10/2026