26-U-004 Section 10 WRP Clarifier 3 and RAS/WAS Pump Station Improvements Addendum 3

Location: Arizona
Posted: Jan 28, 2026
Due: Feb 4, 2026
Agency: Bullhead City
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: Starting : 12/10/2025 8:00 AM
Publication URL: To access bid details, please log in.


26-U-004 Section 10 WRP Clarifier 3 and RAS/WAS Pump Station Improvements

Starting: 12/10/2025 8:00 AM

REVISED Due Date: 02/04/2026 3:00 PM

Department: Bullhead City Utilities

Pre-Bid Conference (Attendance is NOT mandatory): 12/18/2025 10:00 AM 901 Richardo Avenue, Bullhead City, AZ

Attachments:

IFB.Sec10clarifier3.Volume1.120225

Volume 2 Clarifier 3 And RAS WAS Pump Station Improvements

Volume 3 Clarifier 3 And RAS WAS Pump Station Improvements Rev

Adden1.Sec10clarifier3.010226

Adden2.Sec10clarifier3.012026

Adden3.Sec10clarifier3.012826

Project Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.

Attachment Preview

CITY OF BULLHEAD CITY, ARIZONA
UTILITIES DEPARTMENT
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION
IMPROVEMENTS
PROJECT NO. 26-U-004
ADDENDUM NO. 3
January 28, 2026
26-U-004
Addendum No. 3
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION IMPROVEMENTS
January 28, 2026
Page 2 of 9
26-U-004
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION IMPROVEMENTS
Addendum No. 3
The attention of the bidders is called to the following changes and clarifications to the original
contract specifications and they shall be taken into account in preparing proposals and shall be
part of the Bid/Contract Documents.
The following changes and clarifications are to be made and become part of the Bid/Contract
Documents. The changes and clarifications are as follows:
This Addendum includes a Revised Bid Schedule.
Questions received:
ADMINISTRATIVE:
1. Please confirm that no domestic material requirements are associated with this project
(AIS, BABAA, etc.).
Response: The City is considering obtaining a Water Infrastructure Finance
Authority (WIFA) loan for the project. If the City obtains that loan, then American
Iron and Steel (AIS), federal Davis Bacon wage rates, and certified payrolls would
be required. In the enclosed revised bid schedule, a deductive line item has been
included; if the City does not obtain the WIFA loan, then these items would not be
required. The Contractor should include the amount that would be deducted from
the contract for not having to meet these specific WIFA requirements. See revised
Article 3 – Bid Schedule enclosed with this addendum.
2. Please confirm that no required wage rates or certified payroll are associated with this
project.
Response: See previous response for clarification.
3. Is an additional site walk possible? If so, we would like to schedule a site visit.
Response: An additional site walk has been scheduled per Addendum No. 2.
However, the time has passed for questions and no questions will be answered at
the site walk.
SCHEDULE
4. If this project has to be broken into 26' and 27' fiscal years, is there a way to show the
phasing on the drawings between what is needed to be completed by this fiscal year and
next?
Response: A Notice to Proceed is anticipated to occur around February 18, 2026.
26-U-004
Addendum No. 3
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION IMPROVEMENTS
January 28, 2026
Page 3 of 9
The Contractor shall, at a minimum, install the Owner-supplied clarifier equipment
for Clarifier #1 and Clarifier #2 by June 30, 2026. The new clarifier (Clarifier #3),
RAS/WAS piping, pump, and building improvements must be completed no later
than May 1, 2027. Work completed after May 1, 2027, will be assessed liquidated
damages per the amount listed in the bid documents.
5. The bid form states 180 calendar days from NTP, we do not feel that is enough time for
our scope of work along with the fact that another project is being constructed in close
proximity to our work. Is the City open to letting the bidders tell them how long the
construction duration will take on the bid form?
Response: See previous response.
6. Based on current market conditions, 180 days may be insufficient to complete this
project. Is there a possibility an alternate completion schedule may be considered?
Response: See previous response.
BID FORM
7. Taking a look at the Bid schedule there are 20 items total which is great, however we are
seeing only one bid item for an alternate (Additive Alternate No. 1) but on the plans we
are seeing a second alternate on the plans - sheet C-3 (Additive Alternate 2) by clarifier
3. Should we add an additional bit item for this alternate? Please let us know how you’d
like us to proceed with this. (C-3, 40 05 10)
Response: See Revised Bid Schedule included with this addendum.
8. Specification section 01 11 00 states "Installation of a mixer in either a new manhole or
the clarifier splitter box." The drawings show a mixer installed as a bid alternate in the SE
Manhole. Is the splitter box mixer a bid alternate as well?
Response: The installation of the mixer in the splitter box is considered part of the
base bid and should be included in Bid Item No. 16. For Additive Alternative No. 1,
the Contractor should include any additional cost for the installation of the mixer in
the new manhole at this alternate location.
9. Drawing C-3: There is 24" SE pipe for Additive Alternate #2, but there's no Additive
Alternate #2 in the bid schedule. Is this going to be part of this project? If so, where do we
include the cost?
Response: See Revised Bid Schedule included with this addendum.
OWNER SUPPLIED EQUIPMENT
10. Do clarifiers 1 & 2 have existing concrete coating?
26-U-004
Addendum No. 3
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION IMPROVEMENTS
January 28, 2026
Page 4 of 9
Response: No, the Contractor should plan to install a new coating, as specified
and shown on the Drawings, on the inside of each clarifier as part of this project.
See Drawing M-8, Detail 1 and Section 09 90 00, System No. 17.
11. Are clarifiers 1 and 2 able to be drained fully using existing piping without the need for
additional pumping?
Response: Additional bypass pumping will be required by the contractor. Bypass
can occur from the clarifier splitter box to the influent pump station while each
clarifier is taken down for service. This pumping can last a maximum of 14 days
per clarifier before the clarifier must be returned to service. The City did an
emergency repair to a clarifier in 2025 and found that a bypass pumping rate of
1200 gpm during the peak hour was sufficient to maintain the plant flows.
Coordination with the plant operators will be required to manage plant flows
during this time. The operators will also explore lowering the MLSS concentration
prior to the start of bypass pumping to help manage loading to the single clarifier
during this period.
12. Will the clarifying equipment come pre-coated from the manufacturer? Please provide us
with a copy of the Purchase Order for the clarifying equipment so we can verify finishes
and equipment.
Response: Purchase orders for the three clarifiers are provided, and each
purchase order lists the responsibilities of the owner and WesTech. The contractor
will support the owner on the items listed as the owner’s responsibility.
13. Are the pumps in the RAS/WAS building going to be provided? I know internal parts of the
clarifier will be provided. I’m just seeing asterisks that aren’t super clear on the plans and
the spec sheet.
Response: RAS/WAS pumps are to be provided by the contractor.
14. Can you please confirm if the V-Notch Weir is included in the provided clarifier
equipment? In the spec it looks like it will be included but the plans do not indicate that it
will be. Please confirm (M-8, 46 05 50)
Response: WesTech supplies the V-notch weirs for all clarifiers. See the purchase
orders provided.
15. Please confirm the scope of work items below.
We are furnishing and installing the new prestressed clarifier structure under this
contract?
Response: Yes
26-U-004
Addendum No. 3
SECTION 10 WRP
CLARIFIER 3 AND RAS/WAS PUMP STATION IMPROVEMENTS
January 28, 2026
Page 5 of 9
We are not furnishing the clarifier mechanism and any items marked with (**) but we
are installing them?
Response: This is true for the clarifier mechanisms and equipment identified in
Specification 46 05 50. All three proposals for the clarifier equipment are
included with this addendum. However, pumps in the RAS/WAS room are to be
supplied and installed by the Contractor.
We are furnishing or installing all items marked with (*)?
Response: This is true for the prestressed clarifier. The single asterisk note on
Sheet E-2 is in error and should be removed.
16. Section 43 05 50 and March 28, 2025 WesTech Proposal for Clarifier No. 3:
a. Please confirm the radius to the flat region of the center for the sludge withdrawal
ring of 9’-0” or 18’-0” diameter (20% of tank diameter per WesTech Proposal for
Clarifier No. 3).
Response: The radius is 18 feet as per WesTech and M-8. (Please note that the
11 x 17 drawings will print at half scale.)
b. Please confirm the weights provided in the WesTech Proposal are appropriate
for the center pier design. Please provide summary of loads to center of pier and
to the tank wall.
Response: The weights are entirely in WesTech’s control and must be
coordinated with WesTech during the submittal process. Contractor may
contact WesTech to obtain this information anytime.
c. Please provide the radius, quantity, embedment depth, and diameter of center
column bolts into the center pier.
Response: This information will be provided as part of the submittal process.
Contractor may contact WesTech to obtain this information anytime.
d. Please provide necessary embedment depths for all other anchorage of items to
the tank, including but not limited to the scum box, scum box supports, weir,
baffles, walkway, etc.
Response: This information will be provided as part of the submittal process.
Contractor may contact WesTech to obtain this information anytime.
e. The AWWA D110 Type III tank utilizes a waterstop at the floor-wall connection
embedded in a 12” tall curb with an internal diameter of 88’-10”. Please confirm
there are no issues with the rake mechanism to accommodate this.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.