DG01--NextGEN Infrastructure Upgrades

Location: Federal
Posted: Aug 19, 2026
Due: Aug 28, 2026
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • D - Automatic Data Processing and Telecommunication Services
Solicitation No: 36C24126Q0644
Publication URL: To access bid details, please log in.
Follow
DG01--NextGEN Infrastructure Upgrades
Active
Contract Opportunity
Notice ID
36C24126Q0644
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Aug 19, 2026 06:57 am EDT
  • Original Published Date: Aug 03, 2026 07:33 pm EDT
  • Updated Date Offers Due: Aug 28, 2026 05:00 pm EDT
  • Original Date Offers Due: Aug 20, 2026 05:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Oct 27, 2026
  • Original Inactive Date: Sep 19, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: DG01 - IT AND TELECOM - NETWORK SUPPORT SERVICES (LABOR)
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    West Haven VAMC West Haven , 06516
    USA
Description
SITE VISIT

Site Visit information: Site visit will be held on Friday, 21 August 2026 at 1:00 PM EST located at the West Haven VAMC. Please contact Peter Sandor directly (peter.sandor@va.gov; (203) 932-5711 Ext. 3152) to schedule attendance at West Haven VAMC. Please note all questions must be submitted to Shawn Lawrence (Shawn.Lawrence@va.gov), prior to Tuesday 25 August 2026 at 3:00 PM EST. No questions will be answered at the site visit.
RFIs

Will the Government host a site visit or walkthrough prior to the response date? Conduit routing, run lengths, and mounting conditions are the primary cost drivers on this effort, and a brief escorted walkthrough of the 12 locations would allow quoters to price accurately.
A site visit has been added to the solicitation.
CLINs 0001 and 0003 and Section 3.3 reference "10 locations," but the CLIN quantities are 12 each and the location table in Section 3.3 lists 12 rows. Please confirm the full scope is 12 locations and the CLIN quantities of 12 govern.
There are 12 locations in total. Section 3.3 has been updated.
Will the Government provide drawings, approximate conduit run lengths, or distances from each IT closet to the corresponding AP location? If not, the site visit in question 1 becomes essential for responsible fixed pricing.
A site visit has been added to the solicitation.
Please describe ceiling and mounting heights at the AP locations, particularly the sub-ground, basement, and mechanical-type spaces in Buildings 1, 5, and 24. Are there locations that will require powered lifts, and if so, are lifts able to reach those areas (elevator access and floor loading for upper floors such as Building 1, Level 9)?
Do not expect ceiling heights of no more than 8
Section 3.7 includes Attachment C, VA Newington Campus Map, while Section 3.3 states all work is at the West Haven VAMC. Please confirm there is no work at the Newington campus under this contract.
Newington Map removed.
What working hours apply? Specifically, will above-ceiling work in patient care areas be permitted during normal business hours, or should quoters anticipate evening or weekend work? Please also confirm whether ICRA or other infection control permitting will be required for above-ceiling activities.
ICRA carts will be required in common spaces. Vendor is required to provide ICRA cart.
Can contractor personnel vetting and badging under VA Directive 0710 begin immediately at award, and does the Government anticipate the 30-day period of performance accounting for background investigation processing time?
Yes, Vetting and badging will start at time of award. Do to access to IT equipment and spaces the full PIV will need to be acquired prior to initial work performance.
Section 5.2 references reconciliation of a "Profit-figure anomaly noted in the Drafter's Note," but no Drafter's Note is included in the solicitation. Please clarify or confirm this reference does not apply.
Reference removed. Section 5.2 has been updated. Â
Attachments/Links
Contact Information
Contracting Office Address
  • ONE VA CENTER
  • TOGUS , ME 04330
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Aug 3, 2026[Combined Synopsis/Solicitation (Original)] DG01--NextGEN Infrastructure Upgrades - COMM TEAM 2
Aug 5, 2026[Combined Synopsis/Solicitation (Updated)] DG01--NextGEN Infrastructure Upgrades
Aug 31, 2026[Combined Synopsis/Solicitation (Updated)] DG01--NextGEN Infrastructure Upgrades
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.