| Location: | California |
|---|---|
| Posted: | May 22, 2025 |
| Due: | Jun 4, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include constructing an approximately 54 linear-foot concrete drilled pile retaining wall along Edgewood Avenue at 643 Edgewood Avenue in Mill Valley. Two redwood trees, that conflict with the proposed retaining wall, has been removed by the county. The remaining tree stumps shall be grinded below the pie cap or grade as indicated on the plan, and the roadway in front of the wall will be reconstructed. Construction will take place in the daytime hours with traffic control measures and road closures as necessary.
See ENG 2020-24 - 643 Edgewood Avenue Roadway Stabilization Project for full details.

With GovernmentContracts, you can:
..., chipping, and shaping of trees, high voltage line clearing, tree safety inspections, ...
State Government of California
Bid Due: 9/21/2026
...-owned properties, tree stumps, fence lines, rights-of-way, concrete islands and vacant lots. Alameda...
Alameda County
Bid Due: 10/15/2026