| Location: | Colorado |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | Boulder County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BID-260-26 |
| Publication URL: | To access bid details, please log in. |
Please register in Euna (formally Bonfire) to access virtual meeting information.
A non-mandatory pre-bid meeting will be conducted on March 31, 2026, starting promptly at 1:00 p.m. on Microsoft Teams.
Background:
Contractors have the option to bid on the Peaceful Valley Bridge Repair, 84W Bridge Repair, or combined to show cost savings for awarding both projects to the same contractor. These projects consist of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under bridge abutments. These projects also include temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.
Scope of Work (84W and Peacful Valley):
This project consists of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under both bridge abutments. This project also includes temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.

With GovernmentContracts, you can:
...-of-grand-junction Important Notice The City of Grand Junction does not control or administer ...
City of Grand Junction
Bid Due: 7/07/2026
...traction/cable elevator (3,000-lb capacity, 3 stops, Motion Control VFMC-1000-PTC controller) will undergo... includes ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/12/2026
...elevator (3,000-lb capacity, 3 stops, Motion Control VFMC-1000-PTC controller) will undergo a full... ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/12/2026
...: $985,000.00. Virtual Pre-Bid Meeting on May 12, 2026 at 11:00 a.m. To ...
City of Denver
Bid Due: 6/09/2026