| Location: | Colorado |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | Boulder County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BID-260-26 |
| Publication URL: | To access bid details, please log in. |
Please register in Euna (formally Bonfire) to access virtual meeting information.
A non-mandatory pre-bid meeting will be conducted on March 31, 2026, starting promptly at 1:00 p.m. on Microsoft Teams.
Background:
Contractors have the option to bid on the Peaceful Valley Bridge Repair, 84W Bridge Repair, or combined to show cost savings for awarding both projects to the same contractor. These projects consist of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under bridge abutments. These projects also include temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.
Scope of Work (84W and Peacful Valley):
This project consists of removal of existing riprap, installation of new riprap scour countermeasures, and infill of voids under both bridge abutments. This project also includes temporary creek diversion and access, and temporary erosion control best management practices, to minimize construction impacts to North Saint Vrain Creek.

With GovernmentContracts, you can:
...diversion, riprap, aggregate roadway surfacing, electrical line relocation, and temporary widening... and micropiles. ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 6/17/2026
..., preparation of certified traffic control plans, and installation/removal of temporary traffic control ...
Town of Vail
Bid Due: 7/03/2026
..., preparation of certified traffic control plans, and installation/removal of temporary traffic control ...
Town of Vail
Bid Due: 7/03/2026