| Location: | Washington |
|---|---|
| Posted: | Mar 22, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...and other work. Involves 24 items and 60 working days. Work class 5, ...
State Government of Washington
Bid Due: 6/17/2026
...working days. Work class 1, clearing, grubbing and draining, and work class 5, ...
State Government of Washington
Bid Due: 7/08/2026
...Post Date 05/20/2026 Quest Number 10209332 Category Code Buried Storage Tanks,Concrete Repair... ,Concrete ...
City of Wenatchee
Bid Due: 6/16/2026
...CIP Concrete & Topping Assembly Public Works Project ID: BP 03.1A (PW#2024-039AC) Release ...
City of Seattle
Bid Due: 6/24/2026