| Location: | Washington |
|---|---|
| Posted: | Mar 22, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...with Portland Cement Concrete and/or asphalt concrete; installations of pipe sections, installation...
King County
Bid Due: 11/03/2026
...to existing sewer and drainage pipes of varying depth and size, including Cured ...
City of Seattle
Bid Due: 11/04/2026
...structures and pipes, clearing and grubbing, landscaping, RRFB signals, traffic signals, signing... and ...
City of Seattle
Bid Due: 11/04/2026
...-Cable Construction, Installation and Maintenance (Fiber Optic, Communication, Computer, etc.) 929-24-Car.../Rehabilitation) 913-15-Construction, Canal ...
State Government of Washington
Bid Due: 11/20/2026