| Location: | Washington |
|---|---|
| Posted: | Aug 20, 2026 |
| Due: | Aug 28, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26026Q0816 |
| Publication URL: | To access bid details, please log in. |
Solicitation: 36C26026Q0816
Amendment number: 0001
Offer due date extended to 8/28/2026 due to vendors questions.
Solicitation: 36C26026Q0816
Amendment number: 0002
Questions from vendors
________________________________________________________________________________________________________
Below are questions from various vendors. The CO attempted to get all of the questions answered from the COR.
Kick-Off What is the anticipated timeline for contract award and contract kickoff? 30-45 days
Estimated contract award is estimated to be 8/31/2026 – 9/4/2026.
Contract Kickoff is estimated to be 9/7/2026 – 9/11/2026.
How long will the awardee have to staff and start first months service?
Scope and System Depth (PWS 1.2, 1.5.a-b) The PWS states maintenance and service will be performed "throughout the two campuses as applicable," but does not quantify the system footprint.
Onsite Cadence and Staffing Limits (PWS 1.5.c) The PWS specifies two days per week onsite, "or as dictated by specific needs" and notes "if any specific project requires extra attention that campus will be visited consecutively as necessary."
Material Provisioning and Pricing Structure (PWS Section 2.1, Section 3.0 Task 2) Task 2 states the Contractor is responsible for "providing hardware and software." Section 2.1 states invoices will be billed as individual line items per the price schedule.
Third-Party Integration Boundaries (Section III) The RFI requires the contractor to "Coordinate support for integrated systems or buildings not directly under Contractor control" and provide "limited third-party validation and troubleshooting."
Delta Certification Pathway (PWS Section 2) Section 2 requires the Contractor be certified to operate on Delta Controls with record of completion of the Fundamental Technical Certification Exam. Research indicates this training and certification is only accessible through Delta's authorized Partner network, with no open enrollment path for non-Partner firms. Under FAR 11.002(a)(1)(ii), specifications cannot be unduly restrictive to competition.
Security Clearances (Section 6) Section 6 states the contractor must reimburse the VA within 30 days for background investigations conducted by OPM.
Analytics and Reporting (PWS Task 8) Task 8 requires quarterly status reports covering current status, needs, and recommendations.
Travel
| Jul 16, 2026 | [Solicitation (Original)] Building Automation Support (BAS) Vancouver WA and Portland Oregon VA Medical Centers. |
| Aug 11, 2026 | [Special Notice (Original)] Building Automation Support (BAS) Vancouver WA and Portland Oregon VA Medical Centers. |

With GovernmentContracts, you can:
...-Air Conditioning, Heating and Ventilating Engineering 925-22-Control Systems Engineering 907-35... Solicitation Information Title ...
State Government of Washington
Bid Due: 9/21/2026
...improvements, electrical and controls for County provided booster pump station. There will be ...
County of Cowlitz
Bid Due: 9/28/2026
..., temporary erosion control, hot mix asphalt (HMA) paving, beam guardrail, electrical system ...
State Government of Washington
Bid Due: 9/23/2026
...60-hp booster pumps and associated piping, electrical, control systems, and all other work ...
City of Stanwood
Bid Due: 9/29/2026