| Location: | Pennsylvania |
|---|---|
| Posted: | May 25, 2025 |
| Due: | Jun 10, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Green Lane Borough, Montgomery County, PA |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be done under this contract consists of all labor, equipment, and materials to complete base repairs, full depth reconstruction, and milling and overlay, and removal of excess materials of various Borough roadways, as described in the Drawings and Specifications.
All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Borough Standards. Bid costs for asphalt materials shall be based on PennDOT’s June 2025 Asphalt Cement Price Index. Work shall be substantially completed within 60 calendar days and ready for final payment 90 calendar days after the Contract Times commence.

With GovernmentContracts, you can:
...: Ready Mixed Concrete and Cement/Concrete Products Description: The Department of General Services... ...
State Government of Pennsylvania
Bid Due: 7/31/2029
...wood furring strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer... ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
...strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer requirements. The ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
.../8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding... into ...
DEPT OF DEFENSE
Bid Due: 9/21/2026