| Location: | Utah |
|---|---|
| Posted: | Jun 30, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026B-07 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project, consisting of the following items of work: mobilization, obtaining all bonds and insurance including railroad insurance as required, remove and replace fire hydrants, asphalt, base rock and other finish amenities, furnish and installation of approximately 310 lineal feet of 12-inch PVC SDR 35 sanitary sewer pipe with an approximately 123 lineal feet of a 24-inch steel sleeve casing pneumatically installed under Union Pacific Railroad with restrained joints, spacers, end seals and anodes. Includes coordination with RailPros for approved workplan to install casing/carrier pipe under Union Pacific Railroad. Includes reconnection of all existing sanitary sewer laterals, abandoning existing manholes, placement of new manholes, and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.

With GovernmentContracts, you can:
...equipment and infrastructure to make the upgraded facilities complete and operational; construction... Construction ...
Tooele city
Bid Due: 8/13/2026
...MDT Project Description: Salt Lake City New Water Reclamation Facility (New WRF) - ...
State Government of Utah
Bid Due: 8/05/2026
...includes new parking management equipment installation and other incidental construction....
State Government of Utah
Bid Due: 7/28/2026
...) will accept bids for the construction of the WRF PRIMARY CLARIFIER AND ...
State Government of Utah
Bid Due: 8/04/2026