| Location: | Washington |
|---|---|
| Posted: | Nov 15, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 11/24/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
.../restoration, channelization, signing, concrete bike barriers, driveways, traffic signals, landscaping, storm... drainage, and ...
City of Seattle
Bid Due: 11/04/2026
...882 10# This contract provides for the construction of: Sidewalks, curb and gutter, ...
City of Lakewood
Bid Due: 10/21/2026
...facility, storm drainage inlet, conveyance piping, and pump station, located at Located at ...
Sammamish Plateau Water
Bid Due: 10/28/2026
...streets to paved streets with curb, gutter, sidewalks, storm drainage, street lighting, and ...
Moses Lake city
Bid Due: 11/03/2026