| Location: | Vermont |
|---|---|
| Posted: | Jun 2, 2026 |
| Due: | Jul 1, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building) Bid Description: The goal of the project is to stabilize Thatcher Brook in Waterbury downstream of the I-89 highway bridge to protect the sewer lines located in the channel and floodplain. The project generally includes removing fill to widen the channel, creating a flood bench, stabilizing the banks, and establishing river channel grade control through a series of weirs. The project location is 1,200-feet of the channel where the channel and Stowe Street are in close proximity. The project is located in the Edward Farrar Utility District (Downtown Waterbury, VT) that is seeking competitive bids to complete the stabilization project. Construction plans accompany this Request for Construction Bids. Please contact Roy at rschiff@slrconsulting.com for the complete bid package including design plans.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
Reading ER P23-1 (404) Request Date: 7/29/2026 1:05:25 PM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/21/2026
Williston Road Stormwater Structures Request Date: 7/29/2026 8:42:48 AM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/27/2026
Follow Dental and Audiology Coordinator for the Vermont Army National Guard Active Contract
DEPT OF DEFENSE
Bid Due: 8/23/2026
Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing
State Government of Vermont
Bid Due: 8/19/2026