| Location: | Vermont |
|---|---|
| Posted: | Jun 2, 2026 |
| Due: | Jul 1, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building) Bid Description: The goal of the project is to stabilize Thatcher Brook in Waterbury downstream of the I-89 highway bridge to protect the sewer lines located in the channel and floodplain. The project generally includes removing fill to widen the channel, creating a flood bench, stabilizing the banks, and establishing river channel grade control through a series of weirs. The project location is 1,200-feet of the channel where the channel and Stowe Street are in close proximity. The project is located in the Edward Farrar Utility District (Downtown Waterbury, VT) that is seeking competitive bids to complete the stabilization project. Construction plans accompany this Request for Construction Bids. Please contact Roy at rschiff@slrconsulting.com for the complete bid package including design plans.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...RFP - Trout River Floodplain Restoration Final Design Request Date: 7/17/2026 2:34:47 PM ...
State Government of Vermont
Bid Due: 8/14/2026
...Poultney River Tributary Stream and Wetland Restoration Request Date: 7/7/2026 12:44:34 PM Open... ...
State Government of Vermont
Bid Due: 7/30/2026
...Follow S205--Waste Disposal and Recycle contract White River Junction Vermont Active Contract.../GARBAGE COLLECTION ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/30/2026
...and the Lamoille River. Work consists of streambank stabilization and associated restoration activities...
State Government of Vermont
Bid Due: 8/17/2026