| Location: | Virginia |
|---|---|
| Posted: | Sep 25, 2025 |
| Due: | Nov 4, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 103947 |
| Publication URL: | To access bid details, please log in. |
City of Alexandria -Alexandria, Virginia
Closing On: 11/4/25 3:00 PM
Time Left: 39 days
The project involves the following: 1. Installing communications conduit and fiber optic cable along Eisenhower Avenue between Van Dorn Street and Clermont Avenue .2. Installing traffic cameras (CCTV) along Eisenhower Avenue between Van Dorn Street and Clermont Avenue; 3. The connection of the proposed cameras and traffic signals on west Eisenhower to the City's Transportation Management Center (TMC).Interested vendors should go to https://service.alexandriava.gov/MSS/Vendors/default.aspx and look under bid number 1180 for the solicitation documents. The solicitation will not be provided in the eVA system, only in the City's Vendor Self Service System
IFB Construction
Â
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Overview Summary The City of Richmond is accepting bids for the construction of ...
City of Richmond
Bid Due: 8/10/2026
...City of Richmond is accepting bids for the construction of the US 60 ...
State Government of Virginia
Bid Due: 7/27/2026
...Time Left: 33 days Phase 1 of this construction project includes demolition, grading, ...
State Government of Virginia
Bid Due: 8/27/2026
..., conduit bury, recovering and seeding, wire terminations, testing and operational training... for ...
State Government of Virginia
Bid Due: 8/04/2026