| Location: | South Carolina |
|---|---|
| Posted: | Sep 11, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Town of Pelion Water Main Improvements Phase 2 September 2026
SRF 3210010-03
SECTION 00 10 00
INVITATION TO BID
PART 1 - GENERAL
The Joint Municipal Water and Sewer Commission will accept bids for:
Project Title: Town of Pelion Water Main Improvements Phase 2
Project Description:
The project will consist of the installation of 1,699 linear feet (LF) of 10-Inch Ductile Iron Pipe with 3
replacement fire hydrants to replace the aging water distribution system. The project spans from the
intersection of Magnolia Street and Pine Street to the intersection of Maple Street and Pine Street.
This project is being funded by a loan from the South Carolina Department of Environmental Services
(SCDES) State Revolving Fund (SRF). Bidders must comply with all applicable state and federal
requirements identified in the bid documents, including but not limited to Davis-Bacon and American
Iron and Steel (AIS) provisions.
Date of Opening: October 13, 2026
Time of Opening: 2:00 PM
Owner's Name and Address:
Town of Pelion
Post Office Box 7
Pelion, South Carolina 29123
Phone: 803-894-3535
Operator's Name and Address:
Joint Municipal Water and Sewer Commission
Mailing Address (USPS Only): Physical Address (All Other Delivery Services):
JMWSC JMWSC
Post Office Box 2555 2546 Two Notch Road
Lexington, South Carolina 29071 Lexington, South Carolina 29072
Phone: 803-359-8373
Engineer's Name and Address:
Gregory H. Hodges, P.E.
Michael Baker International, Inc.
700 Huger Street
Columbia, South Carolina 29201
Phone: 864-373-1234
INVITATION TO BID 00 10 00 - 1
Town of Pelion Water Main Improvements Phase 2 September 2026
SRF 3210010-03
Availability of Plans: Contact Greg Hodges at Greg.Hodges@mbakerintl.com for Project Bid
Documents.
PART 2 - PRODUCTS
THIS PART IS NOT APPLICABLE
PART 3 - EXECUTION
THIS PART IS NOT APPLICABLE
END OF SECTION 00 10 00
INVITATION TO BID 00 10 00 - 2

With GovernmentContracts, you can:
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... Engineer ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...Method: Design-Bid-Build Construction Cost Range: $350,000 to $450,000 Prime Contractor License... NUMBER OF ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/23/2026
...29201 Project Delivery Method: Design-Bid-Build Construction Cost Range: $100,000 to $150,000 Agency...: https://scbo.sc.gov/files/scbo/SE-310_R60-N061-JM.pdf ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 11/05/2026
...; Time: November 9, 2026 - 5:00pm Project Location: Ware Shoals, SC Project ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 11/09/2026