Maintenance Dredging of NY & NJ Harbor, Arthur Kill 50ft Reach

Location: New York
Posted: Dec 26, 2024
Due: Jan 10, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912DS25S0009
Publication URL: To access bid details, please log in.
Follow
Maintenance Dredging of NY & NJ Harbor, Arthur Kill 50ft Reach
Active
Contract Opportunity
Notice ID
W912DS25S0009
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NAD
Office
W2SD ENDIST NEW YORK
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Dec 26, 2024 10:13 am EST
  • Original Response Date: Jan 10, 2025 02:00 pm EST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jan 25, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1KF - CONSTRUCTION OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    New York , NY
    USA
Description

Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project



Market Survey Background Information



The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 100,000 cubic yards (CY) of material from the critical shoal area. The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt and clay.



Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, contractor provided, state permitted upland placement site(s) would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. All necessary permits required for the dredged material placement will be provided by the contractor to the government.



The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government.



Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 2,500 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.



The proposed work is anticipated to take place in the summer / fall of 2025. The work is estimated to cost between $10,000,000 and $25,000,000.





SURVEY OF THE DREDGING INDUSTRY



The following confidential survey questionnaire is designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Arthur Kill 50 foot Reach maintenance dredging project.



General




  1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.

  2. Have you performed dredging within the waters of the Port of New York and New Jersey?

  3. Do you have experience with the placement of dredged material at a suitable, contractor provided, state permitted upland placement site? Please list your experience.

  4. What percentage of work (volume of material dredged, transported, processed and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor?

  5. Would you be willing to bid on the project previously described? If the answer is No, please explain why not.

  6. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?

  7. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?

  8. What is the largest dredging contract, in dollars, on which you were the prime contractor?

  9. What is your bonding capacity per contract? What is your total bonding capacity?

  10. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates?

  11. Do you have experience applying USACE EM 385-1-1 (Mar 2024) and all requirements?

  12. Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes.



Equipment



13. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics.



14. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth.



15. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity.



16. Do you have the capability to process the dredged material on your own? If so please explain. If not, what commercial provider of dredge material processing will you engage for this project? What is the daily processing capacity in either case?



17. Will you be able to meet a production rate of 2,500 cubic yards per calendar day and complete all work?



18. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box / Silent Inspector) employing a Dredged Material Inspector (DMI)?






Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300
  • NEW YORK , NY 10278-0004
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Dec 26, 2024 10:13 am ESTSources Sought (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...12 Title: EJ Community Impact Grant Program Round 13 CR#: 2133975 Agency: Environmental.../2026 ...

The New York State Contract Reporter

Bid Due: 7/01/2026

.../31/2026 Solicits input from interested stakeholders to inform the NYSERDA Environmental Research... on ...

State Government of New York

Bid Due: 7/31/2026

...that will be attached as an Exhibit to the subsequent RFP. Expectations for ...

State Government of New York

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.