| Location: | Florida |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Florida Department of State |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 30668216 |
| Publication URL: | To access bid details, please log in. |
| Notice: 30668216 | |
| Notice of Bid/Request for Proposal | |
| Department: | DEPARTMENT OF EDUCATION |
| Division: | University of Central Florida |
| Overview | |
|
UCF-613 Discovery and Innovation Hub The project will consist of preconstruction and construction services for a new 58,000 GSF building, a second-floor bridge connector to existing building 150, facade/interior upgrades to building 150, and parking lot modifications to provide a net increase of 75-95 surface parking spots. The total project cost will be approximately $60,000,000 for planning, design, permitting, construction, landscape/hardscape/irrigation, and furnishings and equipment with a construction cost of approximately $46,000,000 (includes cost of work, information technology, fees, bonds, insurance, contingency, and builder’s risk). The project size, scope, and budget may be changed at UCF’s discretion, and this project is subject to the availability of funding. The contract for Construction Management services includes the development of a Guaranteed Maximum Price (GMP) at 100% Construction Documents, with possible Early Release Packages for schedule accelleration. If the GMP is accepted, the Construction Manager becomes the single point of responsibility for performance of the construction of the project. The selected Construction Manager is expected to work collaboratively with the architect during design to ensure that design options presented to the Owner remain on budget. Cost estimating services throughout design, including major drawing milestones, will be be included in the preconstruction fee. NOTE: The Selection Committee may reject all proposals and stop the selection process at any time. The University also reserves the right to cancel the project at any time. Instructions for submitting a proposal can be found on the Project Fact Sheet. The Project Fact Sheet, Construction Management Qualifications Supplement Form, and any additional information may be obtained on our website https://www.fp.ucf.edu/vendors/current-advertisements/ or by contacting: Gina Seabrook, Email: gina.seabrook@ucf.edu, Phone: (407)823-5894. We are accepting only electronic submissions, to be uploaded at: https://ucf.bonfirehub.com/opportunities/227730 Submittals must be received by 5:00 p.m. local time April 22, 2026. Late submissions or additional documentation will not be accepted. |
|
| REFERENCE MATERIALS: | No reference(s). |

With GovernmentContracts, you can:
...Commercial Irrigation Repairs and Services Contract Solicitation Number: Bid 26-148 Open Date...
Polk County
Bid Due: 6/17/2026
...Request for Proposals North Florida Mobile Irrigation Lab Services Department of Agriculture... and ...
State Government of Florida
Bid Due: 6/05/2026
...Title Start Date End Date Status ITB No. 26-23-45133 Irrigation Maintenance and Repair ...
Jacksonville International Airport
Bid Due: 6/29/2026
...Follow Cape Canaveral National Cemetery Ornamental Grass Renovation and Irrigation National Shrine...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/23/2026