| Location: | Washington |
|---|---|
| Posted: | Jan 23, 2026 |
| Due: | Feb 3, 2026 |
| Agency: | County of Clark |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2807 |
| Publication URL: | To access bid details, please log in. |
The project consists of removal and replacement of approximately 34,000 sf of gravel parking lot surface to an 8” depth, installation of concrete curbing, asphalt approaches at entrance and exit, installation of ADA compliant sidewalk, regarding existing water detention areas, regrading of site to improve drainage, jet-vac existing stormwater pipes and inlets and other items associated with the repair work.
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Wednesday, January 21, 2026. Attendees shall meet in the overflow lot located at 361 NE 35 th Avenue, Camas WA 98607.

With GovernmentContracts, you can:
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026
...control, landscaping, roadside restoration, and other work. Involves 181 items and 183 working ...
State Government of Washington
Bid Due: 7/08/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek... transportation systems ...
State Government of Washington
Bid Due: 6/24/2026
...of University Place. The 65-foot long, 22-foot-wide bridge consists of four concrete-slab spans... ...
Pierce County
Bid Due: 6/13/2026