SCOIDD-Whitten Center-Fabricate and Install Sidewalk Handrail

Location: South Carolina
Posted: Jan 30, 2026
Due: Feb 16, 2026
Agency: State of South Carolina - State Fiscal Accountability Authority(SFAA)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Project Name:
SCOIDD-Whitten Center-Fabricate and Install Sidewalk Handrail
Agency/Owner:
Department of Disabilities and Special Needs
Ad Publish Date:
January 30, 2026
Project Number:
N/A
Construction Cost Range:
9,000.00-12,000.00
Quote Due Date & Time:
February 16, 2026 - 12:00pm
Project Location:
SCOIDD Whitten Center
Agency Project Coordinator:
Chris Marlowe
Email:
christopher.marlowe@ddsn.sc.gov
Telephone:
803-898-9750
Description:
The South Carolina Department of Behavioral Health and Developmental Disabilities, Office of Intellectual and Developmental Disabilities (“OIDD” or “Office”) is requesting quotes to fabricate and install handrails at Building 110 on the Whitten Center Campus. Closing Date: Monday February 16th, 2026 at 12:00PM. If interested, please email quote to Procurement@ddsn.sc.gov.
Documents May Be Obtained From:
Document link or Procurement@ddsn.sc.gov
Project Details:
https://scbo.sc.gov/files/scbo/Request_For_Quote-Whitten_Center-Handrail_Installation_1.27.26.docx.pdf
Print Ad

Attachment Preview

Request For Quote
Quote: 012826CM01
The South Carolina Department of Behavioral Health and Developmental
Disabilities-Office of Intellectual and Developmental Disabilities is interested in
obtaining a price quote on the services/items listed below. If you would like to
provide a quote, please return this form with your quote information to
Procurement@ddsn.sc.gov NO LATER THAN 12:00PM ON MONDAY, FEBRUARY
16TH , 2026. If you have any questions, please call 803-898-9750.
Price Schedule
The Office of Intellectual and Developmental Disabilities is interested in obtaining
the following items/services at SCOIDD Midlands with the minimum specifications
below.
Date of Submission:___________________
Line Description
Item
1 Fabricate and install handrail at
Building 110 on the Whitten
Center Campus
Total -----------------------------
QTY
Unit Price
1
ea.
$
-------------- ----------- $
**Please review Statement of Work for more details on this project**
Vendor Number:______________________________
Vendor Name: ______________________________
Authorized Signature: __________________________
Contact Name: _______________________________
Telephone: __________________________________
Email Address: _______________________________
*Must be a Registered South Carolina Vendor to provide quote*
STATEMENT OF WORK
1. Background
The South Carolina Department of Behavioral Health and Developmental Disabilities, Office of Intellectual and
Developmental Disabilities provide services for individuals with intellectual disabilities, autism, head and spinal
cord injury and conditions related to each of these four disabilities. Our mission is to assist people with disabilities
and their families through choice in meeting needs, pursue possibilities and achieving life goals; and minimize
the occurrence and reduce the severity of disabilities through prevention. The installation of handrails is necessary
to assist in preventing falls.
2. Objectives
The goal of this contract is to install ADA compliant handrails at Building 110 on the Whitten Center Campus.
Estimated Project Commencement Date:
March 2nd , 2026
Estimated Project Completion Date:
March 16th, 2026
3. Scope
The Contractor must provide all parts and labor to fabricate and install handrails in/along the sidewalk at Building
110 on the Whitten Center Campus. Additional specifications below:
The handrails must meet ADA code and cannot hinder the ingress/egress of the building.
Handrails should be installed on both sides of the sidewalk.
Style: Handrails are to be similar to handrails installed at nearby buildings.
Length: The length of handrails to be installed is approximately 150ft. Vendors are encouraged
to attend the site visit to get exact measurements.
Height: The top of the gripping surface must be between 34 and 38 inches above the walking
surface.
Diameter: For circular handrails, the outside diameter must be between 1.25 and 2 inches.
Perimeter: For non-circular handrails, the perimeter must be between 4 and 6.25 inches, with a
maximum cross-section dimension of 2.25 inches.
Continuity: The gripping surface must be continuous along its length, without obstructions on the
top or sides.
Surface: The gripping surface and any adjacent surfaces must be free of sharp or abrasive
elements and have rounded edges.
Rotation: The handrail must not rotate within its fittings.
Handrails to be painted semi-gloss black.
4. Location of Work
Work will be performed at the SCOIDD Whitten Center, Building 110, located at 28373 US-76, Clinton,
SC 29325.
5. Site Visit By Appointment
Do not show up to the site visit without notifying SCOIDD. If no one requests to attend the site visit, the site
visit for the scheduled day will be cancelled. You must contact SCOIDD at least one (1) business day before the
scheduled site visit notifying them of your intent to attend.
POC for Scheduling Visits: Randy Flack
O: 864-938-3548
M: 864-607-0124
Scheduled date for site visit at Whitten Center: Wednesday February 11th, 2026 at 10:00am.
6. Requirements
Contractor’s Requirements:
Site Visit: All interested contractors should perform a site visit at the centers to ensure they understand the
full scope of the work and site conditions. The site visit will afford the contractor sufficient time to make
certain that he can determine the exact extent of work required.
Contractor shall work with region point of contact to coordinate work schedules and address any questions
regarding standards in this statement of work.
The contractor shall fabricate and install ADA compliant handrails as specified in this scope. Notifying the
region point of contact of process and timeline of installation.
Vendor Registration: You must have a state vendor number to be eligible to submit an offer. To obtain a
state vendor number, visit www.procurement.sc.gov and select Doing Business with Us. Then select New
Vendor Registration. (To determine if your business is already registered, go to "Vendor Search"). Upon
registration, you will be assigned a state vendor number. Vendors must keep their vendor information
current. If you are already registered and know your User ID and Password, you can update your
information by selecting Update Vendor Registration. If you need to update information but do not have
your User ID/Password, you must complete a new vendor registration and On Step 9 – Messages to
Administration indicate “Update vendor number” with your existing 10-digit vendor number. (Please note
that vendor registration does not substitute for any obligation to register with the S.C. Secretary of State or
S.C. Department of Revenue. You can register with the agencies at South Carolina Business One Stop,
http://scbos.sc.gov
SCOIDD Requirements:
Upon bid submittal deadline, SCOIDD will determine the awarded Contractor based upon the lowest quote
of a responsible and responsive bidder. No bids will be accepted after the bid submittal deadline.
Awarded Contractor will be provided a purchase order as a notice to proceed with establishing the work
schedule.
Provide Contractor with point of contact in which to solidify work schedule, identify any conflicts in the
work schedule, and to address any questions regarding standards notated in this statement of work.
Point of contact to direct Contractor on the work site as needed and to ensure that the Contractor
requirements are met to the standards noted in this statement of work.
Payment: Payment for this project will be issued after the project is completed to the standards noted in
this statement of work and an invoice is provided to SCOIDD. Payment will be issued by the payment
method in your vendor profile in the South Carolina business system SCEIS.
6.1. Tasks
Contractor Tasks:
Work Hours: All work shall be performed during the normal working hours (8:00 a.m. to 4:30 p.m.),
Monday through Friday
The Contractor shall coordinate with the region’s point of contact for the purpose of establishing a work
schedule.
Damage to Government property: Contractors shall be responsible for replacement of any facility structure,
to include: grass, turf, curb, road pavement, valve boxes, control markers, sprinkler heads, which is
chipped, marred, damaged and/or ruined at the fault of the Contractor. The Contractor shall bear all costs
associated with replacement and reinstallation.
Contractors shall be responsible for cleaning any facility structure that are soiled or stained as a result of
contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures and
grounds at the end of each workday. No chemicals are to be used at anytime on Government property. The
Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be
brought to the immediate attention of the region’s point of contact prior to washing/cleaning.
At the end of each day the Contractor shall remove all debris from the worksite.
Contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.
The contractor is responsible for supplying all equipment, personnel, tools, supplies and materials to
perform these services.
7. Attachments:
7.1. Image of similar handrails:
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.