| Location: | Federal |
|---|---|
| Posted: | Dec 11, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA865126QB001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Product: 10 lbs. of Glycidyl Azide Polymer (GAP) 0700 plasticizer for use in energetic material formulation development. The purchase will include shipment to Eglin AFB, FL 32542.
Performance Requirements: This product is offered by 3M corporation and sold through secondary vendors.
Noun: Glycidyl Azide Polymer (GAP-0700)
Hazard Classification: 1.3C
Quantity: 10 lbs.
3M™ GAP-0700 Plasticizer has been previously classified by the Department of Transportation as “Propellant, Liquid, UN 0495”.
For shipping, the material will be sealed in an airtight, conductive plastic container and placed inside an inner liner.
Trained personnel in explosive handling are required. Nitrile gloves should be worn if material needs to be handled outside the container due to chemical contamination. The material is a liquid explosive that absorbs moisture from the air.
Certificate of Conformance (CoC) and Certificate of Analysis (CoA): 3M will certify only to the standard 3M manufacturing specification. Report drawing/specifications with noted exceptions from 3M if applicable.
This effort is following commercial procedures: Reference 52.212-1, 52.212-3, 52.212-4 resulting in a contract using commercial procedures, 52.212-4, 52.212.5.
Evaluation Criteria: The product needs to be delivered 6 weeks after placement of order, must meet quantity requirement, adhere to appropriate shipping requirements (additional information provided below), and cost will be considered. Criteria is listed in order of importance. The shipment of materials classified as Division 1.3, which includes explosives with a fire hazard and either a minor blast hazard or a minor projection hazard or both, but not a mass explosion hazard, requires careful handling and transportation. These materials must be transported in accordance with the regulations set forth by the U.S. Department of Transportation (DOT) and the United Nations Recommendations on the Transport of Dangerous Goods. Proper training and adherence to safety regulations are essential to ensure the safe delivery of these types of substances and articles.

With GovernmentContracts, you can:
...performance Safety and functional checks Staff training 3. Equipment Specifications Carl Zeiss Visulas.... ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/24/2026
...Follow Design Bid Build Construction of a Collective Enlisted Training Barracks at Devens ...
DEPT OF DEFENSE
Bid Due: 6/18/2026
...patient safety is at risk. All service must be performed by OEM-trained and ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
...waste site worker training and be familiar with the procedures and requirements of ...
MPN
Bid Due: 6/13/2068