Reno of Workforce Housing

Location: South Carolina
Posted: Jun 3, 2026
Due: Jul 14, 2026
Agency: State of South Carolina - State Fiscal Accountability Authority(SFAA)
Type of Government: State & Local
Category:
  • G - Social Services
Solicitation No: H09-9628-CB
Publication URL: To access bid details, please log in.
Project Name:
Reno of Workforce Housing
Agency/Owner:
The Citadel
Ad Publish Date:
June 3, 2026
Project Number:
H09-9628-CB
# of Bid Copies:
1
Bid/Submittal Date & Time:
July 14, 2026 - 2:00pm
Project Location:
Dunnemann Apts
Project Delivery Method:
Design-Bid-Build
Construction Cost Range:
$1,250,000 to $1,750,000
Agency Project Coordinator:
Michael Dunkerley
Email:
mdunkerl@citadel.edu
Telephone:
(843) 566-4051
Description:
The scope includes main electrical system upgrades to add capacity to the 1951 infrastructure by replacing the main distribution, switchboards, panels, meters, and wiring. Work also includes the demolition of two existing elevators and the installation of a single, modern passenger elevator.
Documents May Be Obtained From:
CEMS Engineering Inc. via Duncan Parnell
Project Details:
https://scbo.sc.gov/files/scbo/SE-310_H09-9628-CB.pdf
Print Ad

Attachment Preview

SE-310
INVITATION FOR DESIGN-BID-BUILD CONSTRUCTION SERVICES
AGENCY: The Citadel
PROJECT NAME: Reno of Workforce Housing
PROJECT NUMBER: H09-9628-CB
CONSTRUCTION COST RANGE: $1,250,000 to $1,750,000
PROJECT LOCATION: Dunnemann Apts
DESCRIPTION OF PROJECT/SERVICES: (450 character limit)
The scope includes main electrical system upgrades to add capacity to the 1951 infrastructure by replacing the main
distribution, switchboards, panels, meters, and wiring. Work also includes the demolition of two existing elevators and the
installation of a single, modern passenger elevator.
BID/SUBMITTAL DUE DATE: 07/14/2026
TIME: 02:00 PM
NUMBER OF COPIES: 1
PROJECT DELIVERY METHOD: Design-Bid-Build
AGENCY PROJECT COORDINATOR: Michael Dunkerley
EMAIL: mdunkerl@citadel.edu
TELEPHONE: (843) 566-4051
DOCUMENTS OBTAINED FROM: CEMS Engineering Inc. via Duncan Parnell
BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID.
PERFORMANCE AND LABOR & MATERIAL PAYMENT BONDS: The successful Contractor will be required to
provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price.
DOCUMENT DEPOSIT AMOUNT: $0.00 IS DEPOSIT REFUNDABLE:
Yes
No
N/A
Bidders must obtain Bidding Documents/Plans from the above listed sources(s) to be listed as an official plan holder. Bidders that
rely on copies obtained from any other source do so at their own risk. All written communications with official plan holders &
bidders will be via email or website posting.
Agency WILL NOT accept Bids sent via email.
All questions & correspondence concerning this Invitation shall be addressed to the A/E.
A/E NAME: CEMS Engineering, Inc.
A/E CONTACT: Jason Brawley
EMAIL: jbrawley@cems-ae.com
TELEPHONE: (843) 875-3637
PRE-BID CONFERENCE:
Yes
No MANDATORY ATTENDANCE:
Yes
No
PRE-BID DATE: 06/23/2026
TIME: 10:00 AM
PRE-BID PLACE:
The Citadel Facilities and Engineering Conference Room 520 Wilson Ave, Charleston SC
29409
BID OPENING PLACE: The Citadel Facilities and Engineering Conference Room 520 Wilson Ave, Charleston SC 29409
BID DELIVERY ADDRESSES:
HAND-DELIVERY:
MAIL SERVICE:
Attn: Michael Dunkerley
Attn: Michael Dunkerley
F&E 520 Wilson Avenue
Charleston, SC 29409
The Citadel Facilities and Engineering
171 Moultrie street, Charleston SC 29409
IS PROJECT WITHIN AGENCY CONSTRUCTION CERTIFICATION?
Yes
No
APPROVED BY:
(OSE PROJECT MANAGER)
DATE: 06/03/2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Ad Title: Beaufort Executive Airport Eight-Bay T-Hangar and 50x50 Box Hangar Design Build... ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 7/28/2026

...Project ID: Title: Beaufort Executive Airport Eight-Bay T-Hangar and 50x50 Box Hangar Design ...

Beaufort County

Bid Due: 7/28/2026

...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Rebecca Dabney Email... commercial ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 8/03/2026

...Delivery Method: Design-Bid-Build Construction Cost Range: $800,000 to $850,000 Agency Project Coordinator...://scbo.sc.gov/files/scbo/H73-9632-PD_SE-310.pdf Print ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 7/28/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.