| Location: | South Carolina |
|---|---|
| Posted: | Feb 24, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB 25-08 |
| Publication URL: | To access bid details, please log in. |
The project consists of the following generally described work: Removal and disposal of existing septic tank; installation of two (2) new 1,500-gallon septic tanks; installation of approximately 1.000 feet of Infiltrator drain field, and associated erosion control and restoration efforts.

With GovernmentContracts, you can:
...* Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...and erosion control measures. Pre-Bid Information: Optional Pre-Bid Meeting held at Lower Reedy ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...and wood habitat and stabilization structures, erosion and sediment control measures, and establishment...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control..., ...
City of Charleston
Bid Due: 8/07/2026