| Location: | Texas |
|---|---|
| Posted: | Feb 25, 2026 |
| Due: | Mar 18, 2026 |
| Agency: | Round Rock Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 26-501 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project includes the installation of more than 4,300 linear feet of storm sewer infrastructure, consisting of reinforced concrete pipe (RCP) and box culverts; 1,730 linear feet of ductile iron water main; and 1,513 linear feet of PVC sanitary sewer. Associated appurtenances include storm inlets, fire hydrants, and related utility components. Roadway work consists of full-depth street reconstruction with TY-C for one roadway segment, trench repair for a second segment, and mill and overlay for a third segment. Additional improvements include the repair and replacement of curb and gutter, sidewalks, driveways, and other incidental work necessary to complete the project.

With GovernmentContracts, you can:
...Boulevard Culvert Improvements IFB Purchasing 5/15/2026 6/11/2026 02:00:00 PM (CT)...
Tarrant County
Bid Due: 6/11/2026
...regrading existing roadside ditches; installing storm sewers, culverts, reinforced concrete box... culverts, junction ...
City of Pearland
Bid Due: 6/18/2026