JOSH STEIN
GOVERNOR
June 4, 2026
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DANIEL H. JOHNSON
SECRETARY
ADDENDUM # 1
Contract Number: DN01158
TIP Number:
N/A
Federal Aid Number: State Funded
WBS Number:
2026CPT.14.13.10871, 2026CPT.14.13.20871
County:
Swain
Description:
Resurfacing Along 5 Segments Of Primary Routes And 1 Segment
Of A Secondary Route in Swain County
Letting Date: June 9, 2026
Plan Holders
Content Summary: Plan Sheet Changes
The above contract has experienced the following revisions:
1. Replace plan sheets 11 and 12 of the DN01158 STANDARD PLANS SHEETS –
ROADWAY with the attached
These revisions do not change bid items or the associated quantities.
There is no ebsx addenda file associated with this addendum.
Thank you for your attention to this matter.
If you have any questions, please contact the Division Proposal Engineer at (828) 331-
5200.
Sincerely,
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS - DIVISION 14
253 WEBSTER ROAD
SYLVA, NC 28779
Jeanette L. White, P.E.
Highway Division 14, Project Development-
Team Lead
Telephone: (828) 331-5200
Fax: (828) 331-5201
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
253 WEBSTER ROAD
SYLVA, NC 28779
PROJECT NO.
2026CPT.14.13.10871, 2026CPT.14.13.20871
SHEET NO.
11
TOTAL NO.
PROJECT NO
COUNTY MAP
NO
ROUTE
2026CPT.14.13.10871 Swain
1
TOTAL FOR MAP NO. 1
US-19 S
2026CPT.14.13.10871
2026CPT.14.13.10871
Swain
2
TOTAL FOR MAP NO. 2
Swain
3
TOTAL FOR MAP NO. 3
US-19 MAIN ST
US-19 CTR
2026CPT.14.13.10871 Swain
4
TOTAL FOR MAP NO. 4
RMP-5430 OI
2026CPT.14.13.10871 Swain
5
RMP-5431 OI
TOTAL FOR MAP NO. 5
TOTAL FOR PROJ NO. 2026CPT.14.13.10871
DESCRIPTION
FROM MAIN ST TO PVMT
CHANGE
FROM US-19 CTR TO EVERETT
ST
FROM SR 1188 TO MAIN ST
FROM US-19CTR TO PVMT
CHANGE
FROM US-19CTR TO PVMT
CHANGE
SUMMARY
TYP LANES LANE LENGTH
NO
TYPE
MI
1
2
2WU 0.107
0.107
1
2
0.183
0.183
1
2
2WD 0.720
0.720
1
2
0.050
0.050
1
2
0.040
0.040
1.100
OF QUANTITIES
WIDTH
FT
1297000000-E 1523000000-E 1575000000-E 1704000000-E 2815000000-N 2830000000-N 2845000000-N 7444000000-E 7456100000-E
BEGIN END MP 1½" MILLING
MP
SURFACE
COURSE,
S9.5C
ASPHALT
BINDER FOR
PLANT MIX
PATCHING
EXISTING
PAVEMENT
ADJ. OF
DROP INLET
ADJ. OF
MANHOLES
ADJ. OF
METER OR
VALVE BOX
INDUCTIVE
LEAD-IN
LOOP
CABLE (14-2)
SAWCUT
SY
TONS
TONS
TONS
EA
EA
EA
LF
LF
40 20.267 20.160
2,491
376
22
2,491
376
22
1
220.00
20.00
1
220.00
20.00
40 20.267 20.450
7,002
612
36
11
6
11
300.00
40.00
7,002
612
36
11
6
11
300.00
40.00
50
0.000 0.720
22,801
1,991
231
2,358
3
3
372.00
30.00
22,801
1,991
231
2,358
3
3
372.00
30.00
24
0.000 0.050
1,125
98
6
1,125
98
6
24
0.000 0.040
404
35
2
404
35
2
33,823
3,112
297
2,358
11
10
14
892.00
90.00
FROM US-19CTR TO PVMT
2026CPT.14.13.20871 Swain
6 SR-1188 / VETERANS BLVD
CHANGE
1
2
2WU 0.143
25
0.000 0.143
3,787
331
20
TOTAL FOR MAP NO. 6
0.143
3,787
331
20
TOTAL FOR PROJ NO. 2026CPT.14.13.20871
0.143
3,787
331
20
GRAND TOTAL
1.243
37,610
3,443
317
2,358
11
10
14
892.00
90.00
PROJECT NO.
2026CPT.14.13.10871, 2026CPT.14.13.20871
SHEET NO.
12
TOTAL NO.
PROJECT NO
COUNTY MAP
NO
ROUTE
2026CPT.14.13.10871 Swain
1
TOTAL FOR MAP NO. 1
US-19 S
2026CPT.14.13.10871
2026CPT.14.13.10871
Swain
2
US-19 MAIN ST
TOTAL FOR MAP NO. 2
Swain
3
US-19 CTR
TOTAL FOR MAP NO. 3
2026CPT.14.13.10871 Swain
4
RMP-5430 OI
TOTAL FOR MAP NO. 4
2026CPT.14.13.10871 Swain
5
RMP-5431 OI
TOTAL FOR MAP NO. 5
TOTAL FOR PROJ NO. 2026CPT.14.13.10871
DESCRIPTION
TYP
NO
FROM MAIN ST TO PVMT
CHANGE
1
FROM US-19 CTR TO EVERETT
ST
1
FROM SR 1188 TO MAIN ST
1
FROM US-19CTR TO PVMT
CHANGE
1
FROM US-19CTR TO PVMT
CHANGE
1
LANES LANE LENGTH WIDTH
TYPE
MI
FT
2
2WU 0.107
40
0.107
2
0.183
40
0.183
2
2WD 0.72
50
0.72
2
0.05
24
0.05
2
0.04
24
0.04
1.1
BEGIN MP
20.267
20.267
0
0
0
END MP
20.16
20.45
0.72
0.05
0.04
4413000000-E
WORK ZONE
ADVANCE/GENERAL
WARNING SIGNING
SF
THERMOPLASTIC AND PAINT QUANTITIES
4457000000-N
TEMPORARY TRAFFIC THERMOPLASTIC
CONTROL
PAVEMENT MARKING
LINES (6", 90
MILS)(WHITE)
4688000000-E
THERMOPLASTIC
PAVEMENT MARKING
LINES (6", 90
MILS)(YELLOW)
THERMOPLASTIC
PAVEMENT MARKING
LINES (6", 90
MILS)(BLUE)
4695000000-E
THERMOPLASTIC
PAVEMENT MARKING
LINES (8", 90
MILS)(YELLOW)
4700000000-E
THERMOPLASTIC
PAVEMENT MARKING
LINES (12", 90
MILS)(WHITE)
4709000000-E
THERMOPLASTIC
PAVEMENT MARKING
LINES (24", 90
MILS)(WHITE)
THERMO LT THERMO
ARROW RT ARROW
90 MILS
90 MILS
4725000000-E
THERMO THERMO
STR
STR & RT
ARROW 90 ARROW 90
MILS
MILS
THERMO THERMO LT
STR & LT
& RT
ARROW 90 ARROW 90
MILS
MILS
LS
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
4810000000-E
4815000000-E 4835000000-E 4890000000-N
4895000000-N
4" WHITE 4" YELLOW 6" WHITE 24" WHITE
YIELD LINE
GENERIC PAVEMENT
PAINT
PAINT
PAINT
PAINT
THERMOPLASTIC
MARKING ITEM -
PAVEMENT MARKING POLYCARBONATE H-
24" YIELD LINE (90 SHAPED MARKERS
MILS)
LF
LF
LF
LF
LF
EA
126
0.07
420
1,325
126
0.07
420
1,325
32
80
108
3
1
2
32
80
108
3
1
2
420
1,325
420
1,325
108
12
108
12
126
0.11
1,403
1,928
80
126
0.11
1,403
1,928
80
126
0.73
3,174
7,460
126
0.73
3,174
7,460
570
105
2
2
570
105
2
2
855
104
6
855
104
6
1
2
1
2
6
6
1,403
1,403
3,200
3,200
7,500
7,500
1,928
1,928
37.00
37.00
185.00
185
6
0.02
300
300
6
0.02
300
300
6
0.01
200
200
6
0.01
200
200
390
0.94
5,497
11,213
80
16,790
32
1,505
317
11
3
2
7
2
25
5,023
8,825
1,928
108
12
13,848
222.00
FROM US-19CTR TO PVMT
2026CPT.14.13.20871 Swain
6 SR-1188 / VETERANS BLVD
CHANGE
1
2
2WU 0.143
25
0
0.143
18
0.06
1,948
1,468
58
TOTAL FOR MAP NO. 6
0.143
18
0.063
1,948
1,468
58
TOTAL FOR PROJ NO. 2026CPT.14.13.20871
0.143
18
0.063
1,948
1,468
58
3,416
1
1
1
1
GRAND TOTAL
1.243
408
1.000
7,445
12,681
80
20,206
32
1,563
317
11
3
2
7
2
1
5,023
8,825
1,928
108
12.00
222
26
13,848
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.