| Location: | Pennsylvania |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Lehighton, Carbon County |
| Publication URL: | To access bid details, please log in. |
Project Description: Installation of approximately 380 LF of 12” DIP water main and approximately 775 LF of 20” HDPE water main from Lehigh Drive, Lehighton Borough, across the Lehigh River, and connecting to existing water main near Bridge Street, Weissport Borough. The 12” DIP is to be installed via open excavation and includes 65 LF of water main crossing a levee. The 20” HDPE is to be installed via horizontal direction drilling. Project also includes water appurtenances, easement clearing, and abandonment of existing 6” water main.

With GovernmentContracts, you can:
...Facility: David Lawrence Convention Center Project: Carbon Backwash Re-Pipe at the Wastewater..., 412-325-6137 ...
Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Bid Due: 9/25/2026
...Project: Schuylkill County - Port Carbon Borough Coal and North Street ADA Improvements ...
PennBid
Bid Due: 9/23/2026
...and an activated carbon treatment system for the removal of PFAS from groundwater ...
PennBid
Bid Due: 10/12/2026
...Street) FY2023 Ref. #: Carbon County, PA Type: IFB Status: Open Open Date: ...
PennBid
Bid Due: 9/17/2026