| Location: | Arizona |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | City of Yuma |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-26-340 |
| Publication URL: | To access bid details, please log in. |
Project Description: Grading modifications to the existing retention basin including new catch basins and a new 18" storm drain system to connect to the new storm water lift station. The new storm water lift station will pump standing water from the existing retention basin at 29th Lane Linear Park to the existing large field on the adjacent property to the east, in order to improve the dissipation rate of the water via increased percolation rate and surface area for infiltration and evaporation in order to minimize and/or prevent standing water related nuisances.

With GovernmentContracts, you can:
.... Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026
...gallon oil and water separator. Civil site improvements consists of grading, drainage, utilities...
City of Prescott
Bid Due: 12/10/2026
.... Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026