| Location: | Arizona |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | City of Yuma |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-26-340 |
| Publication URL: | To access bid details, please log in. |
Project Description: Grading modifications to the existing retention basin including new catch basins and a new 18" storm drain system to connect to the new storm water lift station. The new storm water lift station will pump standing water from the existing retention basin at 29th Lane Linear Park to the existing large field on the adjacent property to the east, in order to improve the dissipation rate of the water via increased percolation rate and surface area for infiltration and evaporation in order to minimize and/or prevent standing water related nuisances.

With GovernmentContracts, you can:
...Project ID: 2027-IFB-002 Title: Fire Pump Replacement at Animal Control Center Addenda: 0 ...
City of Sierra Vista
Bid Due: 9/25/2026
...Project ID: 2027-013-IFB Title: Horizon 6 Fire Booster Pump Station Addenda: 0 Release ...
Mohave County
Bid Due: 10/06/2026
.... Vendors with demonstrated experience in municipal water systems, vertical turbine pump applications...
City of Tucson
Bid Due: 9/24/2026
...Substances (PFAS) from ground water pump and treat systems, as well as soil ...
City of Tucson
Bid Due: 9/23/2026