| Location: | Georgia |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | Cobb County School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B27004 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes canopy work at three elementary school locations, as outlined below:
• Argyle Elementary School: Demolish and replace the existing front entrance canopy system, approximately 72 feet long by 15 feet wide. Replacement of concrete paving and lighting also required.
• Hollydale Elementary School: Base Bid: Replace the existing canopy at the main entrance and design/install a new canopy at the bus area. The main entrance canopy measures approximately 102 feet in length and 14 feet in width, while the bus area canopy will be about 151 feet long and 10 feet wide. Alternate #1: Install New Canopy system extending from the main entrance canopy along both sides at the drive aisle fronting the building.
• Sanders Elementary School: Design and install a new canopy extending from the main entrance canopy along the remaining drive aisle at the front of the building, approximately 148 feet long and 6 feet wide.

With GovernmentContracts, you can:
...City of Twin City, Georgia FY2026 GTIB Paving Improvements Bid Date: Thursday, October ...
G. Ben Turnipseed Engineers
Bid Due: 10/01/2026
...Walton Court Milling and Paving Social Circle, City Of Aug 31, 2026 @ ...
State Government of Georgia
Bid Due: 9/29/2026
...FY2026 GTIB Paving Improvements Twin City, City Of Sep 01, 2026 @ 10:11 ...
State Government of Georgia
Bid Due: 10/01/2026
...Follow ZTL Childcare Facility Paving Project Active Contract Opportunity Notice ID 697DCK-26-R...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/17/2026