| Location: | New York |
|---|---|
| Posted: | Feb 18, 2025 |
| Due: | Feb 25, 2025 |
| Agency: | City of New York |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 07225B0002 |
| Publication URL: | To access bid details, please log in. |
| Program: | Facility Maintenance & Repair Division (FMRD) |
| Industry: | Construction |
| EPIN: | 07225B0002 |
| Procurement Name: | 07225B0002-Restoration and Rehabilitation of Asphalt Paving at various DOC facilities |
| Agency: | DEPARTMENT OF CORRECTION |
| RFx Status: | Released |
| Procurement Method: | Competitive Sealed Bid |
| Release Date: | 2/18/2025 12:00:00 AM |
| Due Date: | 2/25/2025 11:00:00 AM |
| Main Commodity: | Roadwork/Paving Services |
|
EPIN
07225B0002
|
Release Date
2/18/2025 12:00:00 AM (Your Local Time)
|
|
Estimated Number of Contracts
|
|
|
Estimated Procurement Value
7,068,400.00
|
|
|
Agency
DEPARTMENT OF CORRECTION
|
|
|
Agency Contact First Name
johnny
|
|
|
Agency Contact Last Name
Riggins
|
|
|
Agency Contact Email
johnny.riggins@doc.nyc.gov
|
|
|
Concept Report
|
|
|
RFx Title
07225B0002-Restoration and Rehabilitation of Asphalt Paving at various DOC facilities
|
|
|
RFx Status
Released
|
|
This is a requirement contract for the restoration and rehabilitation of the asphalt pavement for various DOC facilities on Rikers Island and The Bronx. The work consist of the installing of 1 ½ inch asphaltic concrete wearing course placed over the prepared existing roadway surfaces (paved or unpaved): the removal of the existing surface as necessary to facilitate storm water runoff; the removal and replacement of defective curbs and adjacent sidewalk; placing necessary traffic marking as required by the DOC Facilities, Maintenance, and Repair Division; and all other work incidental thereto required to assure the prolonged useful life of these roadways at DOC facilities.
This is a requirement contract for the restoration and rehabilitation of the asphalt pavement for various DOC facilities on Rikers Island and The Bronx. The work consist of the installing of 1 ½ inch asphaltic concrete wearing course placed over the prepared existing roadway surfaces (paved or unpaved): the removal of the existing surface as necessary to facilitate storm water runoff; the removal and replacement of defective curbs and adjacent sidewalk; placing necessary traffic marking as required by the DOC Facilities, Maintenance, and Repair Division; and all other work incidental thereto required to assure the prolonged useful life of these roadways at DOC facilities.
|
|
Anticipated Contract Start Date
(M/d/yyyy)
7/1/2025
|
|
Anticipated Contract End Date
(M/d/yyyy)
6/30/2028
|
|
Release Date
(M/d/yyyy)
2/18/2025
|
|
Due Date
(M/d/yyyy)
2/25/2025
|
|
Bid Opening Date
(M/d/yyyy)
2/25/2025
11:30:00 AM
|
|
Questions Due Date
(M/d/yyyy)
Agency Users may not respond to your question if it is submitted after this date.
2/20/2025
|
|
0 Result(s)
|

With GovernmentContracts, you can:
...pavement restoration, concrete and asphalt curb, concrete gutters, precast concrete structures, drainage... installation, ...
Port Chester village
Bid Due: 6/18/2026
...erosion and sediment control measures, including silt sock and concrete washout area, as ...
Niagara Frontier Transit Authority (NFTA)
Bid Due: 6/24/2026
...erosion and sediment control measures, including silt sock and concrete washout area, as ...
Niagara Frontier Transit Authority (NFTA)
Bid Due: 6/16/2026
...pumps, piping and associated equipment. Existing concrete, foundation is to be reused. Modify ...
The City of New York
Bid Due: 7/09/2026