Lagoon Aerator Assembly
| Location: |
California |
| Posted: |
Sep 9, 2025 |
| Due: |
Sep 16, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- 46 - Water Purification and Sewage Treatment Equipment
|
| Solicitation No: |
W911S225U2011 |
| Publication URL: |
To access bid details, please log in. |
Lagoon Aerator Assembly
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
-
Original Published Date: Sep 09, 2025 12:23 pm PDT
-
Original Date Offers Due: Sep 16, 2025 01:00 am PDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Sep 09, 2026
-
Initiative:
Classification
Description
Waste Water Aerator System MOTOR:HORSEPWER: 14.5-15.5RPM: 1150-1250Full Load AMPS:42/21Voltage 230/460Voltage Phase: 3Cycle: 60Service Factor: 1.15-1.20Insulation Class: ?F? NON-Hygroscopic Bearings:Double Row Angular Contact Bearing Life: 950K-1200K hours Enclosure: Totally Enclose Fan-Cooled Motor (TEFC)MOTORSHAFT: Shaft Material: 17-4 Precipitation-Harding (PH), Stainless steel ( S.S), 1150 Condition Shaft Length: 28inches fromend shield face of motor Shaft Diameter: 1.625 inch O.D Minimum Yield Strength: 135K PSI Maximum Yield Strength: 250KPSIPROPELLER: Material: 316 Stainless Steel Balancing: Dynamically to Less than � MIL Maximum DEFLECTOR: Material:304 Stainless Steel, HDG Steel and FRP Exterior Finish: CHEM. Resistant GEL-Coat UV Plate Internal Fill: #3 Quartzite andResin Mixture Minimum FRP Thickness: .375 inch Exterior Color: White Weight: 485-490 LBs POWER MODULE SUPPORTRING: Material: 304 Stainless Steel Dimensions of Flat Rings: .5inch by 3inch by 42 inches O.D. Dimensions of support Rod:1.5 inch by 6 inches Method of construction: Welded AERATOR FLOAT: Method of Construction: Hand Lay Up Material: CDM2415 PROMAT and Chemical Resistant Resin External Finish: Chemical Resistant Gel-Coat UV Stabilized External Color:White Internal Reinforcing (Power Module Support) 3/8 in by 3 inch by 42 inches O.D. Steel Ring Internal Reinforcing (MooringEyes): 3/8inch by 3inches by 9 inches Flat Bar Throat Section Reinforcing: 2inch by 2 inch Encapsulated Ribs Internal Fill:2#DEN. Polyurethane Closed Cell Foam Minimum Thickness: .25inch NON-Stress Areas Mooring Eye Dimension 5/8 inchby 3 inch long Float Diameter: 88 inches Float Thickness: 14 inches Sink Safety Factor: 2.5Volute Thickness: FRP .75 inchThick PERFORMANCE: Pumping Rate: 12,172 GPM02 Transfer Rate: 3.0 LBS/HP/HR/Min Minimum DIA. Of Complete Mix at6 feet Depth: 80 Feet Minimum DIA. Of O2 Dispersion at 6feet Depth: 210 Feet WT. Of Completed Unit: estimated 1700 LBSShipping WT Height of Complete Unit: minimum 54 inches/ max 60 inches. Vendor Provide Aerator Dimensions Chart andmanual Mustbe able to deliver on Weekdays 7am to 3 pm
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Sep 09, 2025 12:23 pm PDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...and upsizing the existing 15 hp storm water pump to 25 hp submersible ...
Los Angeles County Sanitation Districts
Bid Due: 6/23/2026
...and upsizing the existing 15 hp storm water pump to 25 hp submersible ...
Los Angeles County Sanitation Districts
Bid Due: 6/23/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.