Project 598 - Rolla Street Storm Sewer Improvements Addendum 1

Location: Missouri
Posted: Apr 22, 2026
Due: Apr 29, 2026
Agency: City of Rolla
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Public Works Date Posted Bid Summary Bid Tabulation
- Project 598 - Rolla Street Storm Sewer Improvements
- Specifications
- Plans
- Addendum 1
2026-04-08

Attachment Preview

2

INVITATION TO BID
The City of Rolla hereby requests bids for the following project: Rolla Street Storm
Sewer Improvements, Project 598.
Bids will be accepted until 11:00 a.m., Wednesday, April 29, 2026, in the office of the
City Clerk, 3rd Floor, 901 North Elm Street, Rolla, Missouri, at which time they will be
opened. Bids shall be submitted in a sealed envelope and clearly marked "Rolla Street
Storm Sewer Improvements, Project 598".
Mandatory Pre-bid Conference will be held on Wednesday, April 15th, 2026 at 11:00
a.m. in the 4th floor conference room of the Public Works Department, 901 North Elm
Street, Rolla, Missouri.
The Rolla Street Storm Sewer Improvements project consists of the replacement of the
storm sewer system that collects storm runoff on Rolla Street between 5th Street & 12th
Street and discharges east of the intersection of Rolla Street & 5th Street. The project
includes installation of a new box culvert from the discharge point north to 10th Street,
and the installation of additional inlets and piping to collect stormwater from nearby
streets. Contractor shall be responsible for, but not limited to: excavation and removal of
current improvements as needed, grading and backfill, milling and paving, additional
utility coordination, water main relocation at 6th & Rolla Streets, additional sanitary
sewer main and lateral connections, traffic control and detours.
Contractor shall be responsible for compliance with Section 290.250 of the Revised
Missouri Statutes pertaining to prevailing wages.
Only Missouri laborers and laborers from nonrestrictive states are allowed by law to be
employed on Missouri's public works projects when the unemployment rate exceeds 5%
for two consecutive months. (Sections 290.3081 through 290.580 R.S.Mo.)
Bidders are informed that pursuant to Section 285.530, R.S.Mo, as a condition of the
award of any contract in excess of five thousand dollars ($5,000.00), the successful
bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and
participation in a federal work authorization program with respect to the employees
working in connection to the contracted services. Successful bidders shall also sign an
affidavit affirming that it does not knowingly employ any person who is an unauthorized
alien in connection to the contracted services.
Bidders are informed that the project is subject to the requirements of Section 292.675,
R.S.Mo, which requires all contractors or subcontractors doing work on the project to
provide, and require its on-site employees to complete, a ten (10) hour course in
construction safety and health approved by the Occupation Safety and Health
Administration ("OSHA") or a similar program approved by the Missouri Department of
Labor and Industrial Relations which is at least as stringent as an approved OSHA
program. The training must be completed within sixty (60) days of the date work on the
3

project commences. On-site employees found on the worksite without documentation of
the required training shall have twenty (20) days to produce such documentation.
All bidding Contractors shall be expected to review the scope of the work with a
representative of the City Public Works Department prior to bidding.
All bids shall be on the proposal form provided and shall be accompanied by submittals
and a bid bond issued by an acceptable surety company and payable to the order of the
City of Rolla, for not less than five percent (5%) of the total amount of the bid.
The successful Contractor shall be expected to proceed as expeditiously as possible upon
receipt of the NOTICE TO PROCEED and complete the project by May 1, 2027. The
anticipated date for the Notice to Proceed is June 8, 2026.
The Contractor shall perform with its own organization contract work amounting to not
less than thirty (30) percent of the total original contract price, excluding any specialty
items designated by the City. Payment shall be based on actual measured quantities.
Liquidated Damages - Should the contractor fail to complete the work on or before the
completion date specified the contractor will be charged liquidated damages in the
amount of $500.00 per calendar day for each full calendar day that the work is not fully
completed. Liquidated damages will not be charged for weekends and holidays.
The project will be awarded to the lowest, responsive, responsible bidder.
The City reserves the right to reject any and all bids. All work shall be done in adherence
to the City of Rolla Standards and Specifications.
There are utilities that need to be moved in relation to this project, as indicated in the
construction documents. Additionally, the contractor will need to coordinate with other
utilities during construction. It is the contractor's responsibility to verify the location of
all existing utilities. Please refer to the index sheet of project plans for phone numbers
associated with appropriate utility companies.
Bid documents and specifications may be reviewed in, or purchased for $35.00 from the
Rolla Public Works Department, 4th Floor, 901 North Elm Street, Rolla, Missouri 65401.
Bid documents can be picked up Monday through Friday, 8:00 a.m. to 5:00 p.m. PDF
copies will be emailed at no cost. Specifications and the plan sheet can also be
downloaded at www.rollacity.gov/bids.
Matthew Kreyling, P.E.
City Engineer
4

TABLE OF CONTENTS
Notice to Bidders ........................................................................................................................... 3
Instructions to Bidders ................................................................................................................. 9
Information for Bidders ............................................................................................................. 11
I. Contract Documents ........................................................................................... 11
II. Bidder's Obligation ............................................................................................. 11
III. Document Interpretation .................................................................................... 11
IV. Proposals .............................................................................................................. 12
V. Modification and Withdrawal of Bids ............................................................. 12
VI. Signing of Proposals ........................................................................................... 13
VII. Award of Contract .............................................................................................. 13
VIII. Contract Security ................................................................................................ 14
IX. Notice to Proceed................................................................................................. 14
X. Number of Construction Documents ................................................................ 14
Proposal ....................................................................................................................................... 15
Contract Agreement ................................................................................................................... 18
Transient Employer - Lawful Presence .................................................................................... 21
Affidavit of Work Authorization & Documentation ............................................................... 23
Bid Price ....................................................................................................................................... 27
Quotation Form ........................................................................................................................... 29
General Conditions ..................................................................................................................... 31
Contract Documents ............................................................................................................. 31
1.1 Definition ............................................................................................................. 31
1.1.1 The Contract Documents ................................................................................ 31
1.1.2 The Contract ..................................................................................................... 31
1.1.3 The Work .......................................................................................................... 31
1.1.4 The Project ....................................................................................................... 31
1.2 Execution, Correlation and Intent .................................................................... 31
1.3 Ownership and Use of Documents..................................................................... 32
Public Works Director .......................................................................................................... 33
2.1 Definition ............................................................................................................. 33
2.2 Administration of the Contract ......................................................................... 33
City........ ........................................................................................................................... 37
3.1 Definition ............................................................................................................. 37
3.2 Information and Services Required of the Owner ........................................... 37
3.3 City's Right to Stop the Work ........................................................................... 37
5

3.4 City's Right to Carry out the Work .................................................................. 38
Contractor ............................................................................................................................ 39
4.1 Definition ............................................................................................................. 39
4.2 Review of Contract Documents ......................................................................... 39
4.3 Supervision and Construction Procedures ....................................................... 39
4.4 Before Final Payment - Required Final Forms Completion ........................... 39
4.5 Labor and Materials ........................................................................................... 40
4.6 Warranty ............................................................................................................. 40
4.7 Taxes..................................................................................................................... 40
4.8 Permits, Fees and Notices ................................................................................... 40
4.9 Allowances ........................................................................................................... 41
4.10 Superintendent .................................................................................................... 41
4.11 Progress Schedule ............................................................................................... 41
4.12 Documents and Samples at the Site ................................................................... 41
4.13 Shop Drawings, Product Data and Samples ..................................................... 42
4.14 Use of Site............................................................................................................. 42
4.15 Cutting and Patching of Work .......................................................................... 43
4.16 Cleaning Up ......................................................................................................... 43
4.17 Communications ................................................................................................. 43
4.18 Royalties and Patents .......................................................................................... 43
4.19 Indemnification ................................................................................................... 43
Subcontractors ..................................................................................................................... 45
5.1 Definition ............................................................................................................. 45
5.2 Award of Subcontractors and Other Contracts for Portions of the
Work ......................................................................................................................... 45
5.3 Subcontractual Relations ................................................................................... 46
Work by City or by Separate Contractors ........................................................................ 47
6.1 City's Right to Perform Work and to Award Separate Contracts ................ 47
6.2 Mutual Responsibility ......................................................................................... 47
6.3 City's Right to Clean Up .................................................................................... 48
Miscellaneous Provisions .................................................................................................... 49
7.1 Governing Law .................................................................................................... 49
7.2 Successors and Assigns ....................................................................................... 49
7.3 Written Notice ..................................................................................................... 49
7.4 Claims for Damage ............................................................................................. 49
7.5 Performance Bond and Labor and Material Payment Bond.......................... 49
7.6 Rights and Remedies........................................................................................... 49
7.7 Tests ...................................................................................................................... 50
7.8 Interest ................................................................................................................. 50
7.9 Arbitration ........................................................................................................... 50
8.0 Buy America Policy.......................................................................................... 51
Time......... .......................................................................................................................... 53
8.1 Definitions ............................................................................................................ 53
8.2 Progress and Completion ................................................................................... 53
8.3 Delays and Extensions of Time .......................................................................... 53
6

Payments and Completion ................................................................................................... 55
9.1 Contract Sum ...................................................................................................... 55
9.2 Schedule of Values ............................................................................................. 55
9.3 Applications for Payment ................................................................................... 55
9.4 Certificates for Payment ..................................................................................... 56
9.5 Progress Payments .............................................................................................. 56
9.6 Payments Withheld ............................................................................................. 57
9.7 Failure of Payment ............................................................................................. 57
9.8 Substantial Completion ...................................................................................... 58
9.9 Final Completion and Final Payment ............................................................... 58
Protection of Persons and Property .................................................................................. 61
10.1 Safety Precautions and Programs ..................................................................... 61
10.2 Safety of Persons and Property ......................................................................... 61
10.3 Emergencies ......................................................................................................... 62
10.4 Occupational Safety & Health Administration (OSHA) .............................. 62
10.5 Overhead Line Safety Act - MO Revised Statute ......................................... 63
Insurance... .......................................................................................................................... 67
11.1 Contractor's Liability Insurance ....................................................................... 67
11.2 City's Liability Insurance .................................................................................. 67
11.3 Contractor's Builders' Risk Insurance ............................................................. 68
Changes in the Work ........................................................................................................... 69
12.1 Change Orders .................................................................................................... 69
12.2 Concealed Conditions ......................................................................................... 70
12.3 Claims for Additional Cost ................................................................................ 70
12.4 Minor Changes in the Work .............................................................................. 70
Uncovering and Correction of Work ................................................................................. 71
13.1 Uncovering of Work ........................................................................................... 71
13.2 Correction of Work............................................................................................. 71
13.3 Acceptance of Defective or Non-Conforming Work ........................................ 72
Termination of the Contract ............................................................................................... 73
14.1 Termination of the Contract .............................................................................. 73
14.2 Termination by the City ..................................................................................... 73
Supplemental General Conditions ..................................................................................... 75
15.1 Certificate of Owner's Attorney ....................................................................... 75
15.2 Conflict of Interest .............................................................................................. 75
15.3 Copeland "Anti-Kick-Back Act" ....................................................................... 75
15.4 Clean Air Act ....................................................................................................... 76
Special Conditions ................................................................................................................. 77
1.1 Insurance .................................................................................................................. 77
1.2 Workers' Compensation Insurance ....................................................................... 77
1.3 Public Liability and Property Damage Insurance ................................................ 77
2.1 Time for Completion.................................................................................................... 78
3.1 Liquidated Damages .................................................................................................... 78
4.1 Special Wage Determination .................................................................................. 79
5.1 Nondiscrimination in Employment ........................................................................ 79
6.1 Payments .................................................................................................................. 79
7

8.1 Location and Grade ................................................................................................. 80
9.1 Hold Harmless Agreement ...................................................................................... 80
10.1 Affidavit Compliance of the Prevailing Wage Law .................................................. 80
11.1 Contractor's Affidavit Regarding Settlement of Claims .......................................... 81
Hold Harmless Agreement Form. ....................................................................................... 83
Affidavit Compliance of the Prevailing Wage Law ........................................................... 85
Contractor's Affidavit Regarding Settlement of Claims ................................................... 87
Wage Rates ............................................................................................................................ 97
Job Special Provisions ............................................................................................................... 99
8

INSTRUCTIONS TO BIDDERS
1. Bids must be submitted on the "Bidder's Proposal" form only. Bids
must be submitted in a sealed envelope, properly identified with the
project name and number. Attached to the Bid Proposal shall be any
applicable information or specification sheets, properly filled out, for the
items bid.
2. The Bid must be filed with the City Clerk prior to the announced bid
opening date and time.
3. The City of Rolla reserves the right to accept or reject any and/or all
bids.
4. It will be the City's intent to accept low competent bid if it meets
specifications and conditions.
5. The successful Contractor shall be expected to proceed as expeditiously
as possible upon receipt of the NOTICE TO PROCEED and complete
the project by May 1, 2027. The anticipated date for the Notice to
Proceed is June 8, 2026.
6. Liquidated Damages - Should the contractor fail to complete the work
on or before the completion date specified the contractor will be charged
liquidated damages in the amount of $500.00 per calendar day for each
full calendar day that the work is not fully completed. Liquidated
damages will not be charged for weekends and holidays.
7. Bidders are advised that the City of Rolla shall consider prior
substandard goods or prior substandard service delivery or excessive
distance to the City as a criterion for bid rejection.
8. Bids equal in cost and specifications may go to the local bidder (given
they meet all other conditions).
9. All bids shall meet or exceed specifications.
10. Alternate bids may be considered, providing all specification differences
are clearly indicated and contain justification statements. The City of
Rolla shall be the sole judge as to the suitability of the service or
equipment offered for the intended purpose from the alternate bid.
11. Any exceptions to these terms or conditions or deviations from written
specifications shall be shown in writing and attached to the Bidder's
Proposal.
9

12. Bidders are cautioned to verify their proposal before submission as
requests for amendments, withdrawals or proposals, if received by the
City after the time specified for opening, will not be considered.
13. In the event of discrepancies between Bidder's "Per Unit" price
quotation and "Extended Total" quotation, the "Per Unit" quotation shall
prevail.
14. Bidders must be factory authorized dealers for the equipment, service
and parts of the items they are bidding.
15. Local bidders shall be defined as bidders in Rolla and the area
surrounding Rolla for a five-mile radius from the city limits.
16. Successful bidder will be required to have the appropriate City of Rolla
business license.
17. All questions regarding plans or specifications must be directed to the
Department of Public Works no later than 4 working days prior to time
for receipt for proposals. Addendums will be provided to all bidders.
18. Traffic Control will be provided by the contractor.
19. Resident notification will be provided by the City of Rolla. Contractor
to coordinate schedule with Public Works staff.
20. The Contractor shall perform with its own organization contract work
amounting to not less than thirty (30) percent of the total original
contract price, excluding any specialty items designated by the City.
Payment shall be based on actual measured quantities.
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: Boiler Replacement Ref. #: 27-11 Type: RFP Status: Open Open Date: Jul

Parkway School District

Bid Due: 8/07/2026

John Garland Park Landfill Gas System Improvements/Expansion PRJ-010156 StatusAccepting Bids Prebid Date 8/6/26

Drexel Technologies

Bid Due: 8/26/2026

Great Bend Waterpark - Great Bend, KS 242171.01 StatusAccepting Bids Prebid Date 8/4/26

Drexel Technologies

Bid Due: 8/20/2026

Plant 20 Chemical Phosphorous Removal PRJ-010201 StatusAccepting Bids Prebid Date 8/5/26 9:00am Bid

Drexel Technologies

Bid Due: 8/26/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.