| Location: | Washington |
|---|---|
| Posted: | Apr 8, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 4/28/25 1:00pm |
Spokane, WA
This project consists of the reconstruction of overlay slabs and concrete channeling, replacement of existing gravity activated flush system with powered flush control system, providing temporary sewer bypass, electrical conduit and conductors, utility service, site lighting, associated electrical wiring, conduit, & panels, relocation of existing flap check valve, reinforced grassed driveway, ventilation pipe repairs, reconstruction of access manholes, sealing CSO tank roof, wall and roof penetrations, and access risers, removal and replacement of concrete curb, steel access gate, and other related miscellaneous items at three combined sewer overflow (CSO) sites.

With GovernmentContracts, you can:
...Contract I-5/I-205, Concrete Panel Rehabilitation Contract summary Requires replacing cement... concrete panels, repairing ...
State Government of Washington
Bid Due: 6/17/2026
...for slab concrete needed for station rehabilitation. FMNT is responsible for maintenance of ...
Washington Metropolitan Area Transit Authority
Bid Due: 6/18/2026
...Post Date 05/20/2026 Quest Number 10209332 Category Code Buried Storage Tanks,Concrete Repair... ,Concrete ...
City of Wenatchee
Bid Due: 6/16/2026