| Location: | Washington |
|---|---|
| Posted: | Apr 8, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 4/28/25 1:00pm |
Spokane, WA
This project consists of the reconstruction of overlay slabs and concrete channeling, replacement of existing gravity activated flush system with powered flush control system, providing temporary sewer bypass, electrical conduit and conductors, utility service, site lighting, associated electrical wiring, conduit, & panels, relocation of existing flap check valve, reinforced grassed driveway, ventilation pipe repairs, reconstruction of access manholes, sealing CSO tank roof, wall and roof penetrations, and access risers, removal and replacement of concrete curb, steel access gate, and other related miscellaneous items at three combined sewer overflow (CSO) sites.

With GovernmentContracts, you can:
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Systems, Including Infrastructure ...
State Government of Washington
Bid Due: 11/20/2026