| Location: | Texas |
|---|---|
| Posted: | Jan 11, 2026 |
| Due: | Feb 3, 2026 |
| Agency: | Austin Independent School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26CMR037- Construction Manager At- Risk (CMR) for Wooldridge Elementary School |
| Publication URL: | To access bid details, please log in. |
Project Description: Austin Independent School District (“AISD”) requests Statements of Qualifications (SOQ) as Step 1 in a two-step process to select one (1) Construction Manager-at-Risk (CMR) to provide professional services and to perform the construction of the work described below in connection with Large-Scale Renovations and Safety Improvements at four (4) elementary schools that were originally designed as “open concept” schools, an architectural design concept that no longer fits AISD’s educational and safety needs. The four projects are part of the AISD’s 2022 Bond Program, and are being solicited as a single project with multiple sites.

With GovernmentContracts, you can:
...and preferred concept selection * Design development to approximately 60% * Cost estimating ...
Port of Harlingen
Bid Due: 9/23/2026
...Services * Alternative analysis and preferred concept selection * Design development to approximately ...
Port of Harlingen
Bid Due: 9/23/2026
...is no requirement to submit price proposals or design concepts during the initial ...
DEPT OF DEFENSE
Bid Due: 9/23/2026
...Follow SPECIAL NOTICE: 91st Cyber Operations Center Progressive-Design-Build OT Active Contract...-Design-Build OT The ...
DEPT OF DEFENSE
Bid Due: 10/02/2026