Project Description: This Contract provides for the improvement of a new PFAS treatment system that ties into existing water treatment system. Equipment will be installed at the existing facility and include pressure vessels with granular activated carbon for PFAS removal, along with support systems such as rinse water tank, restroom and storage building, modifications to existing booster pumps, associated stormwater, site civil, electrical and instrumentation/control improvements and other work, all in accordance with the attached Plan Set, these Contract
Provisions, and the Standard Specifications, hereafter referred to as “Work.”
The Contract Work shall be Physically Complete within 290 Working Days from the Notice to Proceed. All Contract Work must be completed by December 31, 2027.
Engineer's Estimate - $10,217,000

With GovernmentContracts, you can:
.... The project consists of grading; stormwater improvements; curb and sidewalk construction; ITS, ...
City of Spokane Valley
Bid Due: 6/03/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek...
State Government of Washington
Bid Due: 6/24/2026
...of grading; stormwater improvements; curb and sidewalk construction; ITS, water main installation; HMA...
City of Spokane Valley
Bid Due: 6/03/2026
...and roadway approaches, Stormwater collection and treatment facilities, Pedestrian crossing...
Pierce County
Bid Due: 6/13/2026