| Location: | Washington |
|---|---|
| Posted: | Aug 24, 2026 |
| Due: | Sep 15, 2026 |
| Agency: | City of Vancouver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026 Quote 61 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work shall consist of furnishing and installing approximately 187 lineal feet of 8-inch, and 524 lineal feet of 15-inch Cured-In-Place Pipe (CIPP) to rehabilitate existing storm sewer. The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultraviolet (UV) cured CIPP. This work shall also include bypass pumping, cleaning, root and sediment removal, protruding tap removal, initial Closed-Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection, and other work, all in accordance with attached Plans, Provisions, and the Standard Specifications.
CCTV Footage of the City’s piping can be located at the following link: https://filetransfer.cityofvancouver.us/app?operation=pubopp&id=1786129104699X18100798210000iqK7h
The Contract Work shall be Physically Complete by November 13, 2026.
Engineer's Estimate - $270,705

With GovernmentContracts, you can:
..., materials, incidentals, superintendents, subcontractor coordination, and overhead to perform industrial... electrical repairs, ...
King County
Bid Due: 9/29/2026
.... Prepare/maintain documentation including: inspection logs, daily reports, force accounts, material testing... for ...
City of Sumner
Bid Due: 9/18/2026
..., equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
...is for comprehensive preventive maintenance (PM), corrective repairs, emergency services, testing... contracted. The ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/30/2026