| Location: | Connecticut |
|---|---|
| Posted: | May 14, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BI-RS-378 |
| Publication URL: | To access bid details, please log in. |
Removal of existing heating & hot water heat exchanger, glycol heat exchanger & pump, domestic water heating mixing valve & circulator, modifications to the gas service & piping into the building. Removal & capping of the campus high temperature hot water piping at the penetration into the room (piping is deenergized). Turn over existing ACE water heater to SCSU. New construction includes rigging, installation of two owner provided AERCO boilers & all accessories, venting, piping, pumps, controls & wiring associated with hot water system , glycol heat exchanger & pumps, 2 indirect domestic water heaters, mixing valves & circulator, backflow prevention device on incoming water service, and electrical power to support the equipment including a new panel. DDC system integration w/existing BMS system serving the building/campus.
Start Date: May 14, 2026
End Date: Jun 23, 2026
CT State Colleges & Universities

With GovernmentContracts, you can:
...Rental of Services and Equipment for Roadway Construction This Contract is for the ...
State Government of Connecticut
Bid Due: 8/18/2026
...Invitation to Bid for Construction Services 450 Columbus Blvd. Building/Agency Space Consolidation... Information ...
State Government of Connecticut
Bid Due: 9/02/2026
...Invitation to Bid for Construction Services DESPP Fleet Roof Replacement 47 Mill Hill ...
State Government of Connecticut
Bid Due: 8/24/2026
...Location 207536 caeab9a1-c1a3-4f22-8516-d54e4115374a 2027.0032 City Bid - Construction of Food..., Construction Manager, (203)-977-4179 ...
City of Stamford
Bid Due: 8/20/2026