| Location: | Utah |
|---|---|
| Posted: | Jun 10, 2026 |
| Due: | Jun 16, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CS26081 |
| Publication URL: | To access bid details, please log in. |
Project Description: Stage II Invitation to Bid
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
Project Description: Remove the existing asphalt pavement, landscape islands, and perimeter curb wall to install all new curb and gutter, tree islands, update drainage, and asphalt pavement. Sealcoat all existing asphalt and newly paved areas.
Construction Cost Estimate: $2,200,000.00

With GovernmentContracts, you can:
...ramps, drainage improvements, signing and striping, and all associated restoration....
State Government of Utah
Bid Due: 7/30/2026
...prefabricated bridge structures, pathway tie-ins, drainage improvements, site restoration, and all related work...
State Government of Utah
Bid Due: 8/05/2026
...will be 6" with trailer connections being 6" to 3" Wye's. Drainage must ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/10/2026