| Location: | North Carolina |
|---|---|
| Posted: | Dec 5, 2024 |
| Due: | Dec 19, 2024 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SCO-DOA Downtown Government Complex Electrical Repairs |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | SCO-DOA Downtown Government Complex Electrical Repairs |
| Project Title: | NC Department of Administration - Electrical Repair & Testing for Downtown Government Complex |
| Description: | Electrical Repairs and Testing for large buildings in the Downtown Government Complex in Raleigh, NC 1. Create a bid package for testing circuit breakers in large buildings in the Downtown Government Complex. Provide new short circuit calculations for labeling of switchboards per NEC requirements and oversee testing. •Anticipate scheduling the building testing on Saturdays (with Sunday for additional repairs, if required) to minimize impact on building operations. •Replace circuit breakers identified through testing. 2. The following large buildings are included: a. Archdale b. Museum of Natural Sciences c. Nature Research Center d. DEQ Office e. New Education f. New Revenue g. Archives & History h. Agriculture and Ag Annex i. Plus other DOA buildings as funding allows. 3. Replace main switchboard in Dobbs Building. Multiple circuit breakers failed and were repaired during testing at the last test in Dobbs. |
| Opening Date: | 12/19/2024 4:00 PM |
| Posted Date: | 12/6/2024 |
| Status: | Open |
| Department: | STATE OF NC - CONSTRUCTION OFFICE |
|
Solicitation Number
*
SCO-DOA Downtown Government Complex Electrical Repairs
|
Department
STATE OF NC - CONSTRUCTION OFFICE
|
Status Reason
Open
|
|
|
Opening Date
2024-12-19T16:00:00.0000000
|
Posted Date
*
2024-12-05T20:50:37.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Electrical Repairs and Testing for large buildings in the Downtown Government Complex in Raleigh, NC 1. Create a bid package for testing circuit breakers in large buildings in the Downtown Government Complex. Provide new short circuit calculations for labeling of switchboards per NEC requirements and oversee testing. •Anticipate scheduling the building testing on Saturdays (with Sunday for additional repairs, if required) to minimize impact on building operations. •Replace circuit breakers identified through testing. 2. The following large buildings are included: a. Archdale b. Museum of Natural Sciences c. Nature Research Center d. DEQ Office e. New Education f. New Revenue g. Archives & History h. Agriculture and Ag Annex i. Plus other DOA buildings as funding allows. 3. Replace main switchboard in Dobbs Building. Multiple circuit breakers failed and were repaired during testing at the last test in Dobbs.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: