| Location: | Tennessee |
|---|---|
| Posted: | Jun 26, 2025 |
| Due: | Jun 11, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA910125ReturnBasin |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS SOURCES SOUGHT NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR QUOTE. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS ANNOUNCEMENT IS STRICTLY VOLUNTARY.
This is a Sources Sought Notice to determine the availability and capability of small and large businesses to meet the Government’s requirement for a design/build modernization of the return basin and procurement and installation of turbine pumps at Arnold Engineering Development Complex (AEDC), Arnold AFB, TN. See Rebuild Return Basin Structure Draft Statement of Objectives (SOO) and associated attachments for details.
The anticipated North American Industry Classification System Code (NAICS) for this requirement is 237990, Other Heavy and Civil Engineering Construction with a small business size standard of $45M. The Product/Service Code (PSC) for this requirement is TBD.
Important Notes:
1. Installation must take place during an outage currently scheduled for April 2027 through October 2027.
2. The Government may choose to meet this requirement by utilizing the 10 USC 4022 Authority of the Department of Defense to carry out certain prototype projects.This could include up to two awards for a business process prototype in addition to a conceptual design for the prototype phase.
SUBMISSION DETAILS:
Responses should include:

With GovernmentContracts, you can: